Students can view live GPS data of the location of the After Hours shuttle by downloading the free Ride Systems app for both iPhone and Droid at the school's website. The system provides the location of the shuttle updated every 10 seconds.
Work on the 25,000 square foot new administration building and transit hub is expected to bring much-needed jobs to the Coachella Valley. The building is expected to be completed in late 2013 or early 2014.
Will fund Valley Metro’s 3.1-mile light rail extension into downtown Mesa. The expansion, which should begin service in late 2015, is anticipated to serve nearly 10,000 daily riders.
Centro's new facility includes a 55,000 square foot canopy, 22 sawtooth bus bays and heated sidewalks to help melt the 110 inches of snow that fall during an average winter. The project replaces the "Common Center," which required customers navigate an array of buses that lined up in all four directions of an intersection.
The El Monte Station consists of a new two-story building that will house a public bus and terminal station with limited retail space, a customer service center and surface parking. It is the largest bus station west of Chicago and is used by Metro, Foothill Transit, Greyhound, El Monte Transit and Metrolink Shuttle.
The new members join 26,000 other program participants. In total, participants logged 4.2 million miles carpooling, using transit, bicycling or walking to and from work. This has reduced carbon monoxide by 4.17 tons.
Eldorado National Kansas subsidiary purchased the bus operation assets of Krystal Infinity LLC. Plans to move them to its bus facility in Salina, Kan. and produce Krystal buses there.
The report claims building transit villages and other facilities can boost interest in mass transit, improve the environment and foster economic growth.