Rail

TOD project near SEPTA station planned

Posted on June 9, 2010

PHILADELPHIA — On Monday, plans were announced to begin construction on a transit-oriented development project near Southeastern Pennsylvania Transportation Authority's (SEPTA) Temple University rail station. According to the Philadelphia Inquirer, the project — which will include apartments and ground-floor stores — has been in the planning stages for 10 years and will take 18 months, officials say, creating 400 jobs. To read the full story, click here.

 

View comments or post a comment on this story. (0 Comments)

More News

S.C. city seeking elevated transit line bids

The first phase of the plan would construct a four-mile section elevated guideway above a section of abandoned railroad tracks. The first section of the elevated railway could connect Clemson University's International Center for Automotive Research campus with downtown Greenville.

Calif.'s Metrolink puts PTC into revenue service demo mode

With this latest accomplishment, Metrolink remains on track to become the nation’s first passenger rail system to have a fully implemented, interoperable PTC system in place.

Alstom to supply signalling, infrastructure for Cairo metro line

The company’s shares in these contracts are worth around $90 million.

Hyperloop to build full-scale track next year

The Quay Valley, Calif. Hyperloop track will be built using HTT’s tube, capsule and station models. It will be instrumental in optimizing passenger system needs — such as loading, departure and safety considerations — to ensure Hyperloop is ready for larger-scale operation.

Keolis/MBTA make strides with commuter rail snowstorm recovery

Milestones include the completion of snow and ice removal from all platforms and critical rail switches system-wide, as well as the addition of supplemental trains, doubledecker and standard passenger cars to increase capacity and combat overcrowding.

See More News

Post a Comment

Post Comment

Comments (0)

Please sign in or register to .    Close