Alstom joint ventures to provide traction, signaling in China

Posted on February 24, 2011

Alstom and its two Chinese joint ventures were awarded two contracts by Beijing MTR Construction Administration Corp. to provide both advanced traction and signaling systems for the new Line 6 of the Beijing metro.

Beijing Line 6, which represents the longest metro line in construction in Beijing, runs through the city, starting from Wuluju in the West to Tongzhou New Town in the East. The entry into commercial service of Beijing Line 6 Phase 1 is planned in 2012.

The first joint venture, Shanghai Alstom Transport Electrical Equipment Co., Ltd. (SATEE), will provide a traction system with the latest technology named OPTONIX for the 512 metro cars (64 8-car train set).

OPTONIX, specially designed and developed by Alstom for the Chinese market, reduces travel time and increases frequency of the train operation. Furthermore, it allows the train to consume 30 percent less energy than a conventional metro, according to the company.

In parallel, the second joint venture, CASCO, will deliver an advanced train control and signaling system to Beijing Line 6. The metro line 6 will be equipped with the Urbalis Communication-Based Train Control (CBTC) system that integrates network communications with data transmission by radio.

Already implemented on Line 2, Alstom's Urbalis CBTC system reduces the intervals between trains in order to ensure passenger traffic of over one million passengers per day.


View comments or post a comment on this story. (0 Comments)

More News

Siemens, partners deliver automated peoplemover for Frankfurt Airport

The company will deliver 12 fully automated two-car trains equipped with GoA4 Communication Based Train Control Trainguard MT CBTC, the track work equipment, the station platform doors, communication system, depot equipment, and the power supply system.

FRA taking proactive approach to help railroads meet PTC requirement

At the direction of Secretary Elaine L. Chao, the FRA is taking a proactive approach to ensure railroads acquire, install, test, and fully implement certified PTC systems in time to meet the congressional interim deadline of Dec. 31, 2018.

Despite federal uncertainty, N.C. light rail project optimistic about funding

Half of the Durham-Orange light rail’s cost — totaling over a billion dollars — is expected to come from the federal government.

Las Vegas Monorail unveils Google Pay mobile ticketing

The Monorail now offers riders the ability to quickly and easily purchase fares online and use their phone at the fare gates for immediate transit access to everything along the Las Vegas Strip.

Charlotte Area Transit launches LYNX Blue Line extension

The 9.3-mile extension, coined the Blue Line Extension (BLE) during construction, continues the alignment north from the previous terminus stop at 7th Street Station and now culminates at UNC Charlotte’s main campus.

See More News

Post a Comment

Post Comment

Comments (0)

More From The World's Largest Fleet Publisher

Automotive Fleet

The Car and truck fleet and leasing management magazine

Business Fleet

managing 10-50 company vehicles

Fleet Financials

Executive vehicle management

Government Fleet

managing public sector vehicles & equipment



Work Truck Magazine

The number 1 resource for vocational truck fleets

Schoolbus Fleet

Serving school transportation professionals in the U.S. and Canada

LCT Magazine

Global Resource For Limousine and Bus Transportation

Please sign in or register to .    Close