Rail

Alstom joint ventures to provide traction, signaling in China

Posted on February 24, 2011

Alstom and its two Chinese joint ventures were awarded two contracts by Beijing MTR Construction Administration Corp. to provide both advanced traction and signaling systems for the new Line 6 of the Beijing metro.

Beijing Line 6, which represents the longest metro line in construction in Beijing, runs through the city, starting from Wuluju in the West to Tongzhou New Town in the East. The entry into commercial service of Beijing Line 6 Phase 1 is planned in 2012.

The first joint venture, Shanghai Alstom Transport Electrical Equipment Co., Ltd. (SATEE), will provide a traction system with the latest technology named OPTONIX for the 512 metro cars (64 8-car train set).

OPTONIX, specially designed and developed by Alstom for the Chinese market, reduces travel time and increases frequency of the train operation. Furthermore, it allows the train to consume 30 percent less energy than a conventional metro, according to the company.

In parallel, the second joint venture, CASCO, will deliver an advanced train control and signaling system to Beijing Line 6. The metro line 6 will be equipped with the Urbalis Communication-Based Train Control (CBTC) system that integrates network communications with data transmission by radio.

Already implemented on Line 2, Alstom's Urbalis CBTC system reduces the intervals between trains in order to ensure passenger traffic of over one million passengers per day.

 

View comments or post a comment on this story. (0 Comments)

More News

NJ Transit considers surcharge to pay for Hudson River rail tunnel project

The fee would generate $1.9 billion for NJ Transit's share of the project.

Amtrak launches new mobile app for N.Y. Penn Station

The app provides real-time gate, train, and boarding information for Amtrak customers and also helps direct passengers throughout the station to find gates, exits, ATMs, and restaurants.

Bombardier signs people mover contract with Denver airport

The contract is valued at approximately $150 million and covers a period of seven years.

Chicago taps 3 firms to bid on first phase of rail line modernization project

The Walsh Fluor Design-Build Team, Chicago Rail Constructors, and the Kiewit Infrastructure Co. will submit design-build proposals for the project.

Bombardier to supply 333 UK trains

The overall value of the rolling stock and maintenance contracts are valued at approximately $724 million.

See More News

Post a Comment

Post Comment

Comments (0)

More From The World's Largest Fleet Publisher

Automotive Fleet

The Car and truck fleet and leasing management magazine

Business Fleet

managing 10-50 company vehicles

Fleet Financials

Executive vehicle management

Government Fleet

managing public sector vehicles & equipment

TruckingInfo.com

THE COMMERCIAL TRUCK INDUSTRY’S MOST IN-DEPTH INFORMATION SOURCE

Work Truck Magazine

The number 1 resource for vocational truck fleets

Schoolbus Fleet

Serving school transportation professionals in the U.S. and Canada

LCT Magazine

Global Resource For Limousine and Bus Transportation

Please sign in or register to .    Close