Rail

SEPTA captures regenerative braking energy from trains

Posted on June 29, 2012

The Southeastern Pennsylvania Transportation Authority (SEPTA)  unveiled its ground-breaking recycled energy and optimization project that captures the braking energy of its trains on the Market-Frankford Line and will integrate that power into the regional electric grid.

When SEPTA's trains brake at each stop to load and unload thousands of Pennsylvania passengers, the kinetic energy of the train is converted into electricity. But like many transit agencies across the country, without a method to capture that excess electricity, it could not be stored and used at a later time. Energy storage has proven to be a solution for capturing regenerative braking to provide supply savings. It has also been proven that energy storage can provide support to the electric grid through the frequency regulation market.

SEPTA will capture the regenerative braking energy of trains through a large-scale battery storage system and will deploy that energy as virtual power into PJM's wholesale power frequency regulation and energy markets.

"Through this pilot project, SEPTA will become even more energy efficient, which will help control operating costs — benefiting both customers and taxpayers. We've made our system cleaner, greener and more efficient in recent years — things like replacing traditional diesel buses with diesel-electric hybrids and installing energy-efficient lighting at stations, facilities and offices," said Joe Casey, GM at SEPTA. "These measures are helping us control costs in tough economic conditions — and making us a better neighbor in the communities we serve."

SEPTA launched the pilot project in partnership with Viridity Energy, a smart grid technology firm that specializes in electric market integration.

Saft was selected to provide the design, manufacturing and commissioning of its Intensium Max20 P System, a battery energy storage system (ESS).

Envitech Energy, a member of the ABB group, was selected to provide power controls, power conversion and system integration using its ENVISTORETM System. With these partner technologies and Viridity Energy's VPower software optimization system, the train's regenerative braking energy is being transformed into virtual power that will provide significant energy savings and new energy revenue to support SEPTA's progressive sustainability goals.

The VPower optimizer enables the simultaneous process of regenerative capture, regulation performance and energy market participation by selecting which market to participate in based upon market pricing, battery state of charge and availability of regenerative energy from the trains.

Saft lithium-ion battery technology supplies megawatt level energy storage for the project. Saft, a leader in advanced technology batteries, has provided the project with one of the first dual-purpose trackside Energy Storage Systems in the U.S.

The launch of this project was funded in part through a 2010 Pennsylvania Energy Development Authority grant program as well as support from Ben Franklin Technology Partners.

RELATED ARTICLE: Read how "Green Projects Help Transit Be More Sustainable Off the Road," from our April issue.

View comments or post a comment on this story. (0 Comments)

More News

NJ Transit continues to implement rail safety upgrades

Rail Operations is currently in the process of replacing all stub end tracks at Hoboken Terminal with new sliding friction bumper blocks, as well as advancing a speed control system for trains entering Hoboken Terminal.

WSP USA projects recognized with three Calif. transportation awards

The Exposition Line Light Rail in Los Angeles received the California Transportation Foundation's Overall Project of the Year award.

City Council approves transfer of Atlanta Streetcar to MARTA

The $99 million streetcar opened in December 2014 amid sky-high expectations, but ridership failed to meet expectations in its first year and plummeted nearly 60% after the city began charging $1 to ride.

Honolulu officials submit new light rail plan to FTA

The total project cost included in the new plan remains at $8.165 billion for capital costs exclusive of finance charges, with full revenue service scheduled for December 2025.

Alstom to supply traction system in Chengdu, China

The contract is worth approximately $68.3 million. The line is expected to start revenue service by the end of 2019.

See More News

Post a Comment

Post Comment

Comments (0)

More From The World's Largest Fleet Publisher

Automotive Fleet

The Car and truck fleet and leasing management magazine

Business Fleet

managing 10-50 company vehicles

Fleet Financials

Executive vehicle management

Government Fleet

managing public sector vehicles & equipment

TruckingInfo.com

THE COMMERCIAL TRUCK INDUSTRY’S MOST IN-DEPTH INFORMATION SOURCE

Work Truck Magazine

The number 1 resource for vocational truck fleets

Schoolbus Fleet

Serving school transportation professionals in the U.S. and Canada

LCT Magazine

Global Resource For Limousine and Bus Transportation

Please sign in or register to .    Close