Rail

SEPTA captures regenerative braking energy from trains

Posted on June 29, 2012

The Southeastern Pennsylvania Transportation Authority (SEPTA)  unveiled its ground-breaking recycled energy and optimization project that captures the braking energy of its trains on the Market-Frankford Line and will integrate that power into the regional electric grid.

When SEPTA's trains brake at each stop to load and unload thousands of Pennsylvania passengers, the kinetic energy of the train is converted into electricity. But like many transit agencies across the country, without a method to capture that excess electricity, it could not be stored and used at a later time. Energy storage has proven to be a solution for capturing regenerative braking to provide supply savings. It has also been proven that energy storage can provide support to the electric grid through the frequency regulation market.

SEPTA will capture the regenerative braking energy of trains through a large-scale battery storage system and will deploy that energy as virtual power into PJM's wholesale power frequency regulation and energy markets.

"Through this pilot project, SEPTA will become even more energy efficient, which will help control operating costs — benefiting both customers and taxpayers. We've made our system cleaner, greener and more efficient in recent years — things like replacing traditional diesel buses with diesel-electric hybrids and installing energy-efficient lighting at stations, facilities and offices," said Joe Casey, GM at SEPTA. "These measures are helping us control costs in tough economic conditions — and making us a better neighbor in the communities we serve."

SEPTA launched the pilot project in partnership with Viridity Energy, a smart grid technology firm that specializes in electric market integration.

Saft was selected to provide the design, manufacturing and commissioning of its Intensium Max20 P System, a battery energy storage system (ESS).

Envitech Energy, a member of the ABB group, was selected to provide power controls, power conversion and system integration using its ENVISTORETM System. With these partner technologies and Viridity Energy's VPower software optimization system, the train's regenerative braking energy is being transformed into virtual power that will provide significant energy savings and new energy revenue to support SEPTA's progressive sustainability goals.

The VPower optimizer enables the simultaneous process of regenerative capture, regulation performance and energy market participation by selecting which market to participate in based upon market pricing, battery state of charge and availability of regenerative energy from the trains.

Saft lithium-ion battery technology supplies megawatt level energy storage for the project. Saft, a leader in advanced technology batteries, has provided the project with one of the first dual-purpose trackside Energy Storage Systems in the U.S.

The launch of this project was funded in part through a 2010 Pennsylvania Energy Development Authority grant program as well as support from Ben Franklin Technology Partners.

RELATED ARTICLE: Read how "Green Projects Help Transit Be More Sustainable Off the Road," from our April issue.

View comments or post a comment on this story. (0 Comments)

More News

FRA makes $73M available for rail capital projects, ops assistance

The grants are expected to leverage private, state, and local investments to boost a wide range of rail projects, including the potential for implementing PTC.

Stantec to lead $1.9 billion rail modernization project

The project will add a 9.8-mile third track and add critical capacity on Long Island Rail Road’s busiest corridor.

MTA workers spill 'secrets' of the NYC subway system

Train conductors answer questions about the safest place to sit in the railcar and whether a "sick person" is a euphemism for something else.

First Oklahoma City Streetcar delivered

Each streetcar can carry 104 passengers, and each stop will be served every 12 to 15 minutes.

Siemens, Atlanta Streetcar form techical, digital service partnership

Under the partnership, Siemens will provide technical support and materials for all preventative and corrective maintenance related to the streetcars.

See More News

Post a Comment

Post Comment

Comments (0)

More From The World's Largest Fleet Publisher

Automotive Fleet

The Car and truck fleet and leasing management magazine

Business Fleet

managing 10-50 company vehicles

Fleet Financials

Executive vehicle management

Government Fleet

managing public sector vehicles & equipment

TruckingInfo.com

THE COMMERCIAL TRUCK INDUSTRY’S MOST IN-DEPTH INFORMATION SOURCE

Work Truck Magazine

The number 1 resource for vocational truck fleets

Schoolbus Fleet

Serving school transportation professionals in the U.S. and Canada

LCT Magazine

Luxury Coach & Transportation

Please sign in or register to .    Close