Rail

FRA proposes rule on rail emergency preparedness

Posted on July 3, 2012

The Federal Railroad Administration (FRA) issued a notice of proposed rulemaking (NPRM) that would clarify certain requirements of the existing emergency preparedness standards for passenger trains and address issues that have arisen since the regulations were issued in May 1998.

The changes would ensure that railroad personnel who communicate and coordinate with first responders during emergency situations receive initial and periodic training and are subject to operational efficiency tests and inspections; clarify that railroads must develop procedures in their emergency preparedness plans addressing the safe evacuation of passengers with disabilities during an emergency situation; limit the need for FRA to formally approve purely administrative changes to approved emergency preparedness plans; and specify new operational efficiency testing and inspection requirements for both operating and non-operating employees for railroads.

The proposed requirements are based on recommendations from FRA’s Railroad Safety Advisory Committee’s (RSAC) General Passenger Safety Task Force. Interested parties are invited to submit comments on the proposed rule by Aug. 27, 2012.

View comments or post a comment on this story. (0 Comments)

More News

Chicago Transit replacing airport escalator damaged in train wreck

The train wreck, which occurred in the early morning of March 24, 2014, when the operator allegedly fell asleep, injured more than 30 people and caused roughly $9 million in damage. The lead railcar had to be cut up to remove it from the escalator.

DART takes delivery of first streetcar for new service

The vehicle, which was a designed and built by Brookville Equipment Corp., will be the first streetcar in the U.S. that utilizes wireless traction power.

NJ TRANSIT marks Newark Penn Station's 80th year

Opened in 1935, Newark Penn Station is listed on both the State and National Registers of Historic Places. The station was originally designed and still operates as an intermodal facility serving pedestrian, taxi, bus and private vehicle traffic generated by the more than 50,000 transit customers who use the station each day.

Calgary Transit trains, buses breaking down more often

Part of the problem is an aging fleet, according to officials. Calgary Transit placed a $200-million deal in 2013 to buy 60 new light rail vehicles; however, those vehicles will not be operational until 2016.

Alstom to develop zero-emission train

The new trains for Hermann-Hesse railway line will be completely emission-free. In times of increasing energy costs and higher level of pollution, the development of this technology is essential.

See More News

Post a Comment

Post Comment

Comments (0)

Please sign in or register to .    Close