Rail

FRA proposes rule on rail emergency preparedness

Posted on July 3, 2012

The Federal Railroad Administration (FRA) issued a notice of proposed rulemaking (NPRM) that would clarify certain requirements of the existing emergency preparedness standards for passenger trains and address issues that have arisen since the regulations were issued in May 1998.

The changes would ensure that railroad personnel who communicate and coordinate with first responders during emergency situations receive initial and periodic training and are subject to operational efficiency tests and inspections; clarify that railroads must develop procedures in their emergency preparedness plans addressing the safe evacuation of passengers with disabilities during an emergency situation; limit the need for FRA to formally approve purely administrative changes to approved emergency preparedness plans; and specify new operational efficiency testing and inspection requirements for both operating and non-operating employees for railroads.

The proposed requirements are based on recommendations from FRA’s Railroad Safety Advisory Committee’s (RSAC) General Passenger Safety Task Force. Interested parties are invited to submit comments on the proposed rule by Aug. 27, 2012.

View comments or post a comment on this story. (0 Comments)

More News

Hyperloop to build full-scale track next year

The Quay Valley, Calif. Hyperloop track will be built using HTT’s tube, capsule and station models. It will be instrumental in optimizing passenger system needs — such as loading, departure and safety considerations — to ensure Hyperloop is ready for larger-scale operation.

Keolis/MBTA make strides with commuter rail snowstorm recovery

Milestones include the completion of snow and ice removal from all platforms and critical rail switches system-wide, as well as the addition of supplemental trains, doubledecker and standard passenger cars to increase capacity and combat overcrowding.

Alstom to deliver to Sydney Citadis X05

Company is responsible for the integrated tramway system, which includes the design, delivery and commissioning of 30 coupled Citadis X05 trams; power supply equipment, including APS -ground power supply; signaling systems, the energy recovery system HESOP, depot equipment and maintenance.

Ann Arbor transit official urged MDOT not to lease railcars

In 2009, more than a year before MDOT signed a contract to lease and refurbish the double-decker railcars, which since have cost the state about $12 million, an Ann Arbor transit official told MDOT the cars were not suitable for proposed commuter rail services because they didn't meet federal requirements.

Hitachi purchases manufacturer of Honolulu's rail system

Finmeccanica owns all of AnsaldoBreda, which is unprofitable, and 40% of Ansaldo STS, which is profitable, according to the report. The two Ansaldo companies formed a joint venture, Ansaldo Honolulu JV, to design and build the 20-mile, 21-station elevated train system for Oahu under a $1.4 billion contract.

See More News

Post a Comment

Post Comment

Comments (0)

Please sign in or register to .    Close