Rail

Washington state receives $3.2M rail grant

Posted on November 28, 2012

The U.S. Department of Transportation awarded more than $3.2 million to the State of Washington to enhance capacity and improve reliability for intercity passenger and freight rail in the Pacific Northwest.

The grant will support the $8.4 million Mount Vernon Siding Extension Project, which will reduce intercity passenger and freight rail congestion, add rail capacity and improve a substantial bottleneck, providing long-term benefits to both Amtrak’s Cascades service as well as freight operations.

“This project will provide greater rail capacity and improved reliability for passengers and businesses in the Pacific Northwest,” said Transportation Secretary Ray LaHood. “When it’s complete, this project will bring Washington and Oregon’s Pacific Northwest Rail Corridor Project one step closer to achieving its vision of providing people with a comfortable, reliable and affordable alternative to rush-hour gridlock and crowded airports.”

Completion of the project will improve reliability for Amtrak Cascades service operating on BNSF Railway’s Bellingham Subdivision by reducing conflicts with freight operations. The project will extend the existing siding track that is currently not long enough for freight train use in order to accommodate both intercity and freight trains, helping avoid backups when freight and passenger trains had to share the same track.

The Pacific Northwest’s population is projected to grow 40% by 2050, and the region is running out of room to build more highways or expand airports. The Pacific Northwest Rail Corridor Project is transforming historic train stations into modern transportation centers, acquiring new trains and putting people back to work in both Oregon and Washington.

 

View comments or post a comment on this story. (0 Comments)

More News

Hyperloop to build full-scale track next year

The Quay Valley, Calif. Hyperloop track will be built using HTT’s tube, capsule and station models. It will be instrumental in optimizing passenger system needs — such as loading, departure and safety considerations — to ensure Hyperloop is ready for larger-scale operation.

Keolis/MBTA make strides with commuter rail snowstorm recovery

Milestones include the completion of snow and ice removal from all platforms and critical rail switches system-wide, as well as the addition of supplemental trains, doubledecker and standard passenger cars to increase capacity and combat overcrowding.

Alstom to deliver to Sydney Citadis X05

Company is responsible for the integrated tramway system, which includes the design, delivery and commissioning of 30 coupled Citadis X05 trams; power supply equipment, including APS -ground power supply; signaling systems, the energy recovery system HESOP, depot equipment and maintenance.

Ann Arbor transit official urged MDOT not to lease railcars

In 2009, more than a year before MDOT signed a contract to lease and refurbish the double-decker railcars, which since have cost the state about $12 million, an Ann Arbor transit official told MDOT the cars were not suitable for proposed commuter rail services because they didn't meet federal requirements.

Hitachi purchases manufacturer of Honolulu's rail system

Finmeccanica owns all of AnsaldoBreda, which is unprofitable, and 40% of Ansaldo STS, which is profitable, according to the report. The two Ansaldo companies formed a joint venture, Ansaldo Honolulu JV, to design and build the 20-mile, 21-station elevated train system for Oahu under a $1.4 billion contract.

See More News

Post a Comment

Post Comment

Comments (0)

Please sign in or register to .    Close