Rail

Amtrak sets ridership record for March

Posted on April 9, 2013

Amtrak ridership increased in the first half of Fiscal Year 2013 (Oct. 2012 – March 2013) and March set a record as the single best month ever in the history of the service. In addition, October, December and January each set individual monthly records.

Rebounding strongly from service disruptions caused by Superstorm Sandy and other severe weather, Amtrak ridership grew 0.9% in the first six months of FY 2013 as compared to the same period the prior year. In all, 26 of 45 routes posted ridership increases and Amtrak expects to end the fiscal year at or above last year’s record of 31.2 million passengers.

“The continued ridership growth on routes across the country reinforces the need for dedicated, multi-year federal operating and capital funding to support existing intercity passenger rail services and the development of new ones,” said Amtrak President/CEO Joe Boardman.

Northeast Corridor ridership, which took a significant hit from Superstorm Sandy, is seeing a solid recovery and predicted to show gains for the full fiscal year despite being down 1.2% for this six-month period. Ridership on state-supported and other short distance routes is up 2.7% and long-distance ridership grew 0.5%.

Routes with notable ridership growth in the first six months of FY 2013 include: Palmetto (+10.5%), Coast Starlight (+10%), Illini/Saluki (+9.8%), San Joaquin (+8.9%), Piedmont (+8.6%), Wolverine (+8.2%), Vermonter (+6.7%), Carolinian (+6.3%), Keystone Service (+5.2%), Springfield Shuttles (+5.2%), Downeaster (+4.8%), Pacific Surfliner (+4.3%) and Pennsylvanian (+4.3%).

View comments or post a comment on this story. (0 Comments)

More News

Calif.'s Metrolink puts PTC into revenue service demo mode

With this latest accomplishment, Metrolink remains on track to become the nation’s first passenger rail system to have a fully implemented, interoperable PTC system in place.

Alstom to supply signalling, infrastructure for Cairo metro line

The company’s shares in these contracts are worth around $90 million.

Hyperloop to build full-scale track next year

The Quay Valley, Calif. Hyperloop track will be built using HTT’s tube, capsule and station models. It will be instrumental in optimizing passenger system needs — such as loading, departure and safety considerations — to ensure Hyperloop is ready for larger-scale operation.

Keolis/MBTA make strides with commuter rail snowstorm recovery

Milestones include the completion of snow and ice removal from all platforms and critical rail switches system-wide, as well as the addition of supplemental trains, doubledecker and standard passenger cars to increase capacity and combat overcrowding.

Alstom to deliver to Sydney Citadis X05

Company is responsible for the integrated tramway system, which includes the design, delivery and commissioning of 30 coupled Citadis X05 trams; power supply equipment, including APS -ground power supply; signaling systems, the energy recovery system HESOP, depot equipment and maintenance.

See More News

Post a Comment

Post Comment

Comments (0)

Please sign in or register to .    Close