Rail

Amtrak loses power to hold freight accountable for delays

Posted on July 3, 2013

Amtrak Acela at Boston Station. Photo via Flickr- Loco Steve
Amtrak Acela at Boston Station. Photo via Flickr- Loco Steve
WASHINGTON, D.C. — Amtrak lost its power to assess blame when its trains are delayed and to have a say in whether freight railroads causing those holdups are penalized, according to a Bloomberg Businessweek report. The U.S. Court of Appeals in Washington threw out a law passed to enforce a requirement that freight trains give priority to passenger trains on tracks they share, which they do in most of the U.S.

Amtrak, which tracks and publishes its delays in monthly reports, cited freight-train interference as the most common type of delay over the past 12 months, the report said. For the full story, click here.

RELATED: "Freight and Passenger Rail: Friends or Foes?"

View comments or post a comment on this story. (0 Comments)

More News

Hyperloop to build full-scale track next year

The Quay Valley, Calif. Hyperloop track will be built using HTT’s tube, capsule and station models. It will be instrumental in optimizing passenger system needs — such as loading, departure and safety considerations — to ensure Hyperloop is ready for larger-scale operation.

Keolis/MBTA make strides with commuter rail snowstorm recovery

Milestones include the completion of snow and ice removal from all platforms and critical rail switches system-wide, as well as the addition of supplemental trains, doubledecker and standard passenger cars to increase capacity and combat overcrowding.

Alstom to deliver to Sydney Citadis X05

Company is responsible for the integrated tramway system, which includes the design, delivery and commissioning of 30 coupled Citadis X05 trams; power supply equipment, including APS -ground power supply; signaling systems, the energy recovery system HESOP, depot equipment and maintenance.

Ann Arbor transit official urged MDOT not to lease railcars

In 2009, more than a year before MDOT signed a contract to lease and refurbish the double-decker railcars, which since have cost the state about $12 million, an Ann Arbor transit official told MDOT the cars were not suitable for proposed commuter rail services because they didn't meet federal requirements.

Hitachi purchases manufacturer of Honolulu's rail system

Finmeccanica owns all of AnsaldoBreda, which is unprofitable, and 40% of Ansaldo STS, which is profitable, according to the report. The two Ansaldo companies formed a joint venture, Ansaldo Honolulu JV, to design and build the 20-mile, 21-station elevated train system for Oahu under a $1.4 billion contract.

See More News

Post a Comment

Post Comment

Comments (0)

Please sign in or register to .    Close