Rail

D.C. DOT issues RFQ for integrated premium transit system

Posted on February 4, 2014

Washington, D.C.’s District Department of Transportation (DDOT) issued a Request for Qualifications (RFQ) to firms interested in submitting Statements of Qualification (SOQs) to design, build, operate and maintain an integrated premium transit system.

The system, which includes a streetcar network, local bus provisions, and both existing and new transit facilities, is designed to link neighborhoods with attractive transportation alternatives, reduce short inner-city automobile trips, and facilitate and encourage economic development and affordable housing options within the District.

The Integrated Premium Transit (IPT) advances key elements of the District’s 30-year transit vision. The IPT will be developed in phases and is comprised of 22-miles of dual/single track fixed guideway, related equipment and facilities, and potentially, up to 15 additional miles of fixed guided track.

Additionally, the IPT encompasses all local bus services within the District. To meet the goals of DC’s Transit Future System Plan, the IPT builds upon segments currently in construction or planning, establishes priorities for planning and scheduling purposes, and creates a robust system with the maximum number of linkages. The incorporation of local bus services allows the District to provide transit services in a multi-modal, integrated and efficient manner.

As part of the IPT Program, new transit facilities and services will be added and existing facilities and services will be modified to meet forecasted ridership demands and economic growth within the District. The IPT is expected to be developed in a number of phases with each phase being comprised of “Streetcar Segments” and “Bus Components.”

The procurement will be conducted as a two-step process with an RFQ followed by an RFP. Prospective proposers will be short-listed based upon their SOQ submissions evaluated against the extensive qualification criteria in the SOQ.

The specific limits of the IPT will be further specified in the Request for Proposals (RFP) which will be issued to the short-listed responding teams. DDOT will host pre-SOQ workshop for interested proposers.

View comments or post a comment on this story. (1 Comment)

More News

Alstom opens new Brazilian Citadis production line

The new production facility will serve the Brazilian market and, in a near future, the Latin America region where a number of new tramway projects are emerging. When fully operational, the facility will employ around 150 people.

FRA ramps up campaign to address nationwide grade crossing safety

The first phase of the effort calls upon local law enforcement agencies to show a greater presence at grade crossings, issue citations to drivers that violate rules of the road at crossings and consider rapid implementation of best practices for grade crossing safety.

S.C. city seeking elevated transit line bids

The first phase of the plan would construct a four-mile section elevated guideway above a section of abandoned railroad tracks. The first section of the elevated railway could connect Clemson University's International Center for Automotive Research campus with downtown Greenville.

MBTA considers options to compensate riders for snow woes

One option included offering one week of free fares throughout the system ($6 million in lost revenue).

Calif.'s Metrolink puts PTC into revenue service demo mode

With this latest accomplishment, Metrolink remains on track to become the nation’s first passenger rail system to have a fully implemented, interoperable PTC system in place.

See More News

Post a Comment

Post Comment

Comments (1)

Please sign in or register to .    Close