DETROIT —M-1 Rail is set to begin testing the QLine streetcar with a small motorized inspection car called a “speeder,” Crain’s reports.
The vehicle will travel the rail line as part of a testing regimen that ensures the route is free of obstructions, taking into account the physical dimensions of the vehicle, and ensures proper maintenance of traffic. The slow-moving speeder is operated by a driver and will be flanked by safety vehicles. For the full story, click here.
The "speeder" is coming! QLINE track testing officially underway. First vehicle on rail in Detroit in 60 yrs. pic.twitter.com/5m6PLNJ8Nh
— M-1 RAIL (@M1RAIL) August 23, 2016
0 Comments
See all comments