The first phase of the long-term project, to begin this month, will be the addition of 100 parking spaces at the TRE Station Park and Ride lot bringing it to a total of 478 spaces. The Richland Hills Station has the third highest TRE boardings of stations in Tarrant County.
The original contract, valued at $100,000, began in 2010 and was set to expire in April 2011. The contract has been extended through the end of 2011 with nearly $200,000 in additional contract budget awarded.
The Ontario Association for Suicide Prevention presented the agency with the Arnold Devlin Community Service Award in recognition of its suicide prevention programs: Crisis Link, Gatekeeper, and Acute Psychological Trauma.
Awarded to the recently rebuilt Fox Chase Regional Rail Station, the first train station in the U.S. to receive the designation. In rebuilding, SEPTA implemented numerous eco-friendly practices, including recycling construction waste materials and using low-pollutant emitting building materials.
Significant damage to the line identified last week following Hurricane Irene by an aerial inspection includes up to 40 washout locations, including three washouts each at least a thousand feet long near Sloatsburg, a 400-foot section of track washed out just south of Sloatsburg, significant damage to several railroad bridges and exposure of what had been a subterranean signal cable.