GE unit to build advanced storage battery plant
The new $100 million production facility, scheduled to be fully operational by mid-2011, will be located in upstate New York in the Capital Region and will create 350 new manufacturing jobs.
The new $100 million production facility, scheduled to be fully operational by mid-2011, will be located in upstate New York in the Capital Region and will create 350 new manufacturing jobs.
Service complements local environmental and transportation goals with its commitment to reduce vehicle miles traveled, carbon emissions and congestion in Chicago.
Report: Driver caused Calif. coach crash. Amtrak:High-speed rail unrealistic. Report: BRT cheaper than rail to Oakland airport.
The contract, worth $159.4 million, consists of a firm order, worth $88.6 million, which includes design studies, building a scale 1 model and manufacturing the trainsets.
Digital version will distribute more product information, go green and fill a need for the travel agent community.
In support of Mayor David Miller’s Community Safety Plan, the TTC human resources department developed an outreach and recruitment plan whereby job opportunities were specifically allocated for youth in the priority neighborhoods.
In summer 2011, the company will deliver a new generation Smartlock computerized control unit (PAI-NG), the second such delivery under the framework contract signed by the two companies in 2006.
Ridership increased 8 percent from fiscal year 2007 to 2008, 11 percent from 2008 to 2009 and 21 percent between 2006 and 2009.
TRC will be called upon to work on specifically scoped task orders in support of Metro’s environmental engineering program.
Base subway fares will go up to $2.25 from $2.00 and monthly bus and subway cards will go up to $89 from $81.
Developed in consultation with teams of transportation professionals, public officials and stakeholders, "The Route to Reform" outlines a renewed vision for the federal program as well as ways to pay for it, coupled with a restructuring.
The interlocking upgrade is the first step of a new Metro effort to refurbish their existing system with a seamless transfer, hot standby MicroLok II interlocking controller for vital and non-vital functionality.
Company will supply the three middle cars of the five-car trainsets, amounting to a total of 180 cars. The order is valued at a total of approximately $1.1 billion.
The $43.1 million contract, plus options and alternatives, includes the design and supply of equipment for the train control upgrade of the existing Yonge University Spadina Subway Line.
Gave go-ahead for list of shovel-ready construction projects likely to qualify for $8 billion in federal stimulus funding.
The secure and easy all-access connection to your content.
Bookmarked content can then be accessed anytime on all of your logged in devices!
Already a member? Log In