METRO Magazine Logo
MenuMENU
SearchSEARCH

Going Green in Rail Transport: Maximizing Rail Systems’ Electrical Energy Recovery

Using regenerative braking for rail vehicles can help transit agencies return energy to the system and save money. LTK's TrainOps software helps transit agencies determine how to implement these systems.

by By Natalie E. Cornell
September 22, 2016
Going Green in Rail Transport: Maximizing Rail Systems’ Electrical Energy Recovery

TrainOps overlay of multiple trains’ voltage experience along a rail line, allowing fast identification of system locations in need of traction powerreinforcement.

4 min to read


TrainOps’ computation of energy supply and consumption by category is updated dynamically during simulation. The dark red shows energy supplied by the utility and the light red shows energy productively recovered through regenerative braking.

Many of us are familiar with hybrid and all-electric automobiles that return electrical energy to their batteries when braking. But what about rail vehicles? Rail vehicle regenerative braking — returning electrical energy to the rail power distribution system or even back to the supplying utility — offers tremendous opportunities for electrified rail networks to “go green.”

How can system and vehicle characteristics be optimized to maximize the electrical energy being returned to the system through braking? Unlike the closed systems in an automobile, maximizing the environmental benefits of rail networks with regenerative braking requires careful analysis of equipment settings (both on the vehicles and on the wayside electrical equipment), driver behavior, and operating schedules. LTK Engineering Services’ TrainOps rail system simulation software allows rail systems to “tune” their regenerative braking to maximize environmental benefit. By making a rail system more receptive to regenerated energy, operators can lower utility costs, reduce emissions from the supplying utility, and operate their rail vehicles more efficiently.

Ad Loading...
TrainOps dynamic (while the simulation runs) display of system-wide power demand (black) with 15-minute running average power demand for utility tariff computations (red).

What about a mix of regenerative braking-equipped and non-equipped trains? Rail systems often debate whether to concentrate all of their regenerative braking-equipped vehicles on one line or to distribute the equipped and non-equipped trains throughout their network. The TrainOps software can quickly compare these two scenarios virtually, identifying which one saves the most. The software's sophisticated algorithms support the optimization process to reduce the carbon footprint of electrified rail networks and optimize their energy saving and energy recovery characteristics.

Rail system electrical engineers know that by increasing the maximum system voltage, they can improve the receptivity of the system to accept regenerated energy. But decisions like this are never easy and require a complex trade-off analysis. In this case, higher voltages on the system may put some electrical components at risk of a reduced life. TrainOps can be used to determine the network energy savings from using higher voltage; the value of this energy savings can then be traded off with the cost of upgrading those electrical components to handle higher design voltages. 

Rail systems’ electrical tariffs typically include both consumption and peak demand components. As the utilities’ cost of peak generation capacity increases, the tariffs increasingly weight peak demand in the overall electric bills paid by transit and rail networks. Maximizing regenerative braking offers the opportunity to “shave the peak” so that savings from reduced peak demand can be much greater than reduced consumption. Some utilities measure the peaks at individual supply points while others use the concept of “coincident demand,” looking at all of the rail network’s supply points at the same time.

Peak and RMS currents shown for each substation in the system, along with 100% nameplate ratings, allow visual confirmation that all substations are properly sized for a new or reconfigured network.

Even where regenerative braking is used, rail networks may be overtaxing their traction power systems. Unique in the industry, TrainOps also has the ability to trade-off quality of service to rail passengers with controlling demands on the traction power system. For example, a large heavy rail system in the U.S. recently wanted to understand the reduced traction power system stress achieved by imposing downtown speed limits and/or throttle limits for its operators. “We were able to show the benefits in terms of reduced traction power system stress and the fact that travel times for the public would be minimally effected,” explained LTK’s VP for rail operations planning and simulation Bill Lipfert. “More importantly, TrainOps was able to quickly demonstrate the synergistic benefit of both the speed cap and throttle limit instead of invoking one or the other,” he explained. This temporary operating condition will be nearly imperceptible to the system’s passengers while State of Good Repair backlogs are addressed.  

TrainOps overlay of multiple trains’ voltage experience along a rail line, allowing fast identification of system locations in need of traction powerreinforcement.

TrainOps was specifically developed to enable comprehensive modeling and studies of AC and DC-electrified railroad and transit train operation, as well as operations of fossil fuel-powered trains. The program provides user-friendly inputs (including the ability to “cut and paste” from spreadsheets and other external data sources) for all relevant system and rolling characteristics. These include route alignment data such as track gradients, horizontal alignment and speed restrictions (which can differ by train class) and passenger station locations.

Ad Loading...

TrainOps also has extensive vehicle libraries with attributes such as weight, dimensions, propulsion system characteristics, and braking system parameters. As an optional overlay, users can include system train control data, including wayside signaling, cab signaling and positive train control inputs, where applicable, with user-friendly “point and click” signal control line data entry. As an additional optional overlay, the electrical power supply system data can be included, comprising traction power supply substations and tie stations (circuit breaker houses) as well as the rail system’s electrical distribution network, such as overhead catenary, trolley wire system, or third rail system, and substation feeder cables. Finally, the software includes flexible input of operations data — either in the form of headway-based input or train schedules — including train make-up, train manipulations at terminals/yards, operating plan inputs, passenger station stopping pattern, train loadings, and station dwell times.

Natalie E. Cornell is Director, Business Development for LTK Engineering Services (www.ltk.com).

Subscribe to Our Newsletter

More Rail

Caltrain trains on tracks
Railby StaffMarch 6, 2026

Caltrain Adopts Corridor-Wide Right-of-Way Safety Strategy

Caltrain and its partners have implemented safety improvements at specific locations in response to known risk conditions, operational needs, and available funding since the agency’s founding.

Read More →
A photo of rail tracks in Ottawa, Canada

Building a National Framework for Transit Safety and Consistency

On a recent episode of METROspectives, METRO Magazine’s Executive Editor Alex Roman sat down with Ana-Maria Tomlinson, Director of Strategic & Cross-Sector Programs at the CSA Group, to explore a bold initiative aimed at addressing those challenges: the development of a National Code for Transit and Passenger Rail Systems in Canada.

Read More →
Stairs in a New York rail station with text reading "USDOT Invests $686 Million to Modernize Aging Rail Stations."
Railby StaffMarch 2, 2026

FTA Invests $686M to Modernize Aging Rail Stations

Competitive FTA grants will support accessibility upgrades, family-friendly improvements, and cost-efficient capital projects at some of the nation’s oldest and busiest transit hubs.

Read More →
Ad Loading...
A purple MBTA train at a Mansfield Station platform.
Railby StaffFebruary 27, 2026

MBTA Updates Rail Modernization Plan to Expand Reliability and Accessibility

The strategy outlines near- and long-term upgrades to ease congestion, support housing growth, and advance statewide climate goals.

Read More →
LA Metro underground station with vehicle
Railby StaffFebruary 27, 2026

LA Metro Sets D Line Subway Extension Launch Date

The 3.92-mile addition will soon take riders west beyond its current Wilshire and Western station in Koreatown, continuing under Wilshire Boulevard through neighborhoods and communities including Hancock Park, Windsor Square, the Fairfax District, and Carthay Circle into Beverly Hills.

Read More →
MBTA railcars
Railby StaffFebruary 26, 2026

Boston's MBTA Marks Progress in Regional Rail Modernization

The procurement advances the agency's broader efforts to modernize its rail fleet and position Regional Rail for long-term improvement.

Read More →
Ad Loading...
An Amtrak Acela
Railby StaffFebruary 26, 2026

Amtrak Sets New Course for Long-Distance Fleet Renewal

Under the plan, all long-distance routes will transition to a universal single-level fleet, replacing today’s mix of bi-level and single-level equipment.

Read More →
A TriMet MAX Light Rail vehicle overhead shot
Railby StaffFebruary 24, 2026

STV Finalizes Design for First Phase of TriMet MAX Blue Line Substation Upgrades

The milestone is a significant step toward modernizing the MAX Blue Line’s power infrastructure, one of the oldest components of the region’s light rail system.

Read More →
HDR rendering of LA to Coachella Valley Rail Project
Railby StaffFebruary 20, 2026

HDR Selected to Advance LA–Coachella Valley Rail Corridor Project

The firm will lead the Tier 2 environmental review program for the Coachella Valley Rail Corridor, including the conceptual and preliminary engineering needed to develop project-level environmental clearance.

Read More →
Ad Loading...
Rendering of Austin Transit Partnership's light rail line.
Railby StaffFebruary 19, 2026

Contractor Chosen to Help Build Austin Light Rail

The ATP board’s approval of ARC enables ATP to begin pre-construction activities and advance final design for Austin Light Rail under the first phase of what will be a multibillion-dollar contract.

Read More →