The new locations bring the total of Prevost owned and operated service centers to 14, nearly double the size of the largest competitor network. In addition, the service network is supported by more than 150 certified Volvo Truck locations.
Palm Tran utilized four buses, included a 60-foot articulated bus, for transporting the pets. The effort involved multiple trips and took two days.
The new commuter trains for TEXRail have been designed to reach maximum speeds of 81 mph and boast a coupled length of 266 feet each.
The decision was spurred by Metro’s commitment to all-electric transit buses by 2030, and was supported by the Federal Transit Administration Local Labor Hiring Pilot Program.
Users will be able to browse fare types, make payments, and receive mobile tickets — all within the same app they already use for real-time information and multimodal journey planning.
METRO asked some of the top execs in the industry what they are doing to recruit the next generation of transportation leaders.
METRO asked some of the top execs in the industry what they are doing to provide comprehensive training to both driver and maintenance staff.
Design-build minimizes risk, reduces delivery time, keeps budgets in line, and mitigates funding partner concerns throughout project duration. With traditional design-bid-build, owners, designers, and contractors are segregated from design concept to final construction.