DART selects team for streetcar project
Design is expected to be complete by April 2013. Construction is expected to be complete by June 2014.
Design is expected to be complete by April 2013. Construction is expected to be complete by June 2014.
The project, which begins in spring 2013, will completely rebuild the 43-year-old Red Line South — including all track, ties, ballast and drainage systems — from Cermak-Chinatown to 95th Street.
Transit officials said they restored limited service to the last of 10 branches of the Long Island Rail Road commuter line that suffered damage from Hurricane Sandy. They are still working to mitigate overcrowding and slower than normal commutes.
The three new routes are anticipated to provide faster service because there will be limited stops. The plan is the result of a Transit System Study.
Because the three-tenths of 1% sales tax hike was not approved, the agency will be forced to reduce services by 53%, mostly affecting the poor, elderly and disabled.
The board has awarded contracts to Cummins NPower LLC and New Flyer Industries Canada ULC to perform turnkey overhauls, which include supporting labor and the furnishing, installation and warranty of all supplies and materials associated with the project.
In terms of average weekday boardings, Metro Rail ridership showed a 19% gain compared to one year ago, totaling 360,901 average weekday boardings on the entire 87.7-mile system.
Ninety-five percent of respondents found the region’s public transportation system in poor or fair condition, according to the Southeast Michigan Council of Governments' survey. Another 72% of respondents said they were willing to pay to fix it.
Siemens will provide permanent magnet excited motors, inverters and voltage protection modules to support the rear-axle drive systems of seven new all-electric buses being manufactured by DesignLine for the Société de transport de Montréal.
Awarded to those who demonstrate knowledge, proficiency, education and experience in electromagnetic compatibility and the employment of EMC/EMI principles in electronics and electrical design.
Preparations for the new fleet, including modifications to existing maintenance facilities and construction of a new fueling station, have been under way for months. Once completed, the new CNG fueling station, the largest in South Texas, will support three 500-horsepower compressors capable of fueling 12 buses in six minutes.
List includes implementation of PTC, elimination of distracted driving and improved fire safety.
Once in service the vehicles will account for 18% of AC Transit's 60-foot articulated fleet. Production of the buses is anticipated to begin in March 2013 , with delivery expected by August 2013.
The California Transit Association presented its Transit Excellence Award to the agency for its seasonal Muir Woods Shuttle program.
Balanced without fare increases or service reductions.
The secure and easy all-access connection to your content.
Bookmarked content can then be accessed anytime on all of your logged in devices!
Already a member? Log In