Chicago Transit names Rodriguez president
Board also approved the appointment of Karen Walker as treasurer for CTA. In addition to her duties as treasurer, Walker will also assume the position of chief financial officer.
Board also approved the appointment of Karen Walker as treasurer for CTA. In addition to her duties as treasurer, Walker will also assume the position of chief financial officer.
Topeka Transit loses $215K in fuel gamble. Transit chief pledges no service cuts. Utah mayor switches from streetcar to light rail.
Project includes overall design of the vehicle; integration of the vehicle systems; bogie design; and the supply of propulsion, electrical and communication systems.
Two contracts, which cover work on passenger railways serving the cities of Chennai and Kolkata, will leverage AECOM’s design as well as project and construction management services. AECOM will perform the work on both projects as a part of joint ventures.
New Passenger and Train Information System (PTIS) includes the ability to precisely locate each train and calculate minute-accurate train arrival times to LED signs at all stations.
The 11.7-mile heavy rail line will be an extension to the existing Metrorail system and is projected to serve 85,700 daily riders by 2030, including an estimated 10,000 new daily transit riders.
Funds will increase secure bike parking by 65 percent over the current 380 lockers and launch a bike parking pilot project.
On-board computers will provide automatic next stop announcements and communicate vehicle location and event messages to the central computer-aided dispatch/automatic vehicle location system.
Public transportation use is up 38 percent since 1995, a figure that is almost triple the growth rate of the population (14 percent) and up substantially over the growth rate for the vehicle miles traveled (VMT) on U.S. highways (21 percent) for that same period.
Long concerned about the effect of human fatigue in transportation and the consequences of fatigue on those who perform critical functions in all modes of transportation, the NTSB has issued more than 100 fatigue related recommendations in all modes of transportation.
In addition, commuters who ride public transit to work are now eligible to receive an increase in the monthly transit benefit offered by their employer. The maximum transit benefit is now equal to the parking benefit and increases from $120 to $230 per month.
NTSB: cell phone use a threat. Advocates urge Md. leaders to focus on transit. CTA selling, leasing surplus properties.
A CHSRA team, led by Chairman Quentin Kopp, will travel to Washington next week to meet with President Obama administration officials and Congressional leaders as the details of the high-speed train funding are being worked out.
The initial phase of the contract calls for spending $632 million and is expected to create 25,000 jobs, including a combined $90 million in utility work on the North and Southeast Corridors and $390 million in total costs for the East End Corridor.
The A-train project, which is part of the Regional Transportation Council’s Mobility 2025 and Mobility 2030 plans, has been the central element of DCTA’s Service Plan and endorsed by local, regional and state leaders, as well as Denton County voters.
The secure and easy all-access connection to your content.
Bookmarked content can then be accessed anytime on all of your logged in devices!
Already a member? Log In