With a 5:54 p.m. express train replaced by a 6:19 p.m. train that makes seven stops, commuters are put off schedule. The agency is putting observers on the trains and working on a solution.
Passenger rail service has increased from six daily trains to 22 daily trains, since Caltrans began managing Amtrak's Pacific Surfliner corridor.
It is the third prestigious design award for the train, which has also won the German iF Product Design Award and the 2011 Good Design Award, from the Chicago Athenaeum: Museum of Architecture and Design and the European Centre for Architecture Art Design and Urban Studies.
The contract includes work that was previously divided into four separate construction contracts. It will also provide for a stronger and more consistent program to provide opportunities for small businesses and local residents seeking jobs.
The station is part of the city's Eglinton-Scarborough Crosstown Light Rail Transit system, a project that will connect riders from Black Creek Drive to Scarborough City Center.
The upgrade will include a park-and-ride and transit center, built separately or as a combined facility. City officials are contractors are studying possible sites and gathering input from the public.
As the prime consultant, Parsons Brinckerhoff will be responsible for conducting an AA process leading to the selection of a locally preferred alternative, along with preparation of a New Starts/Small Starts report and the draft environmental review document.