SEPTA lacks funds to replace aging rail fleet
Although ridership is at a 23-year high, SEPTA's budget is at a 15-year low, so it cannot replace the 231 Silverliner IVs which are 36 to 38 years old.
Although ridership is at a 23-year high, SEPTA's budget is at a 15-year low, so it cannot replace the 231 Silverliner IVs which are 36 to 38 years old.
The LFS Artic HEV model ordered combines the ability to handle the highest-volume routes with the quiet, ultra-low emissions hybrid drive. The fuel consumption and carbon footprint of this vehicle is significantly lower than a conventional diesel bus.
From bus rapid transit to bikeways and public seating, the guide showcases a new model for streets that work better for people, bikes, transit and cities.
Of the 471 Virginia Beach respondents, 68% support a referendum that would extend Hampton Roads Transit’s The Tide light rail to the beach.
Said that based on the size of Honolulu and the number of projected riders, bus rapid transit would be a better investment than rail.
Supporters of a 17.3-mile route in the Orange-Durham transit plan said it is critical to concentrating economic and residential growth. Opposition claims only 4.3 miles will serve southern Chapel Hill and there’s no plan for a direct link to Research Triangle Park.
Will upgrade the Watsessing Station building exterior to preserve the historic character of the station; make site improvements surrounding the building at the street and platform levels; and install CCTV cameras, passenger communication systems and updated signage to enhance the overall customer experience.
With a 5:54 p.m. express train replaced by a 6:19 p.m. train that makes seven stops, commuters are put off schedule. The agency is putting observers on the trains and working on a solution.
Passenger rail service has increased from six daily trains to 22 daily trains, since Caltrans began managing Amtrak's Pacific Surfliner corridor.
It is the third prestigious design award for the train, which has also won the German iF Product Design Award and the 2011 Good Design Award, from the Chicago Athenaeum: Museum of Architecture and Design and the European Centre for Architecture Art Design and Urban Studies.
The contract includes work that was previously divided into four separate construction contracts. It will also provide for a stronger and more consistent program to provide opportunities for small businesses and local residents seeking jobs.
The station is part of the city's Eglinton-Scarborough Crosstown Light Rail Transit system, a project that will connect riders from Black Creek Drive to Scarborough City Center.
The upgrade will include a park-and-ride and transit center, built separately or as a combined facility. City officials are contractors are studying possible sites and gathering input from the public.
As the prime consultant, Parsons Brinckerhoff will be responsible for conducting an AA process leading to the selection of a locally preferred alternative, along with preparation of a New Starts/Small Starts report and the draft environmental review document.
Like any H3-45, this one is ideal for transporting teams, and their copious amounts of gear, in comfort.
The secure and easy all-access connection to your content.
Bookmarked content can then be accessed anytime on all of your logged in devices!
Already a member? Log In