Rail

U. of Houston, Metro, settle rail line differences

Posted on August 6, 2012

HOUSTON — After working through disagreements that threatened plans for a light rail line that would cross University of Houston property, school officials agreed to allow the Metropolitan Transit Authority of Harris County (Metro) to start the next phase of construction of the line, the Houston Chronicle reported. In exchange, Metro will address concerns involving access to UH's facilities.

A Metro spokesperson told the Houston Chronicle that the transit agency agreed to pay $1.5 million to take the steps included in the agreement, including provide an alternative access road to ease potential problems. For the full story, click here.

View comments or post a comment on this story. (0 Comments)

More News

Calif.'s Metrolink puts PTC into revenue service demo mode

With this latest accomplishment, Metrolink remains on track to become the nation’s first passenger rail system to have a fully implemented, interoperable PTC system in place.

Alstom to supply signalling, infrastructure for Cairo metro line

The company’s shares in these contracts are worth around $90 million.

Hyperloop to build full-scale track next year

The Quay Valley, Calif. Hyperloop track will be built using HTT’s tube, capsule and station models. It will be instrumental in optimizing passenger system needs — such as loading, departure and safety considerations — to ensure Hyperloop is ready for larger-scale operation.

Keolis/MBTA make strides with commuter rail snowstorm recovery

Milestones include the completion of snow and ice removal from all platforms and critical rail switches system-wide, as well as the addition of supplemental trains, doubledecker and standard passenger cars to increase capacity and combat overcrowding.

Alstom to deliver to Sydney Citadis X05

Company is responsible for the integrated tramway system, which includes the design, delivery and commissioning of 30 coupled Citadis X05 trams; power supply equipment, including APS -ground power supply; signaling systems, the energy recovery system HESOP, depot equipment and maintenance.

See More News

Post a Comment

Post Comment

Comments (0)

Please sign in or register to .    Close