Read More: WMATA to Reopen 2 Orange Line Stations
WMATA Preparing for Auto Doors
The feature enables doors to open automatically when the train stops at the platform.

Metro has been testing Auto Doors during off-hours for months and the system performed without any safety issues more than 2,500 times.
Photo: WMATA
The Washington Metropolitan Area Transit Authority (Metro) announced that customers may notice doors opening faster on some Red Line trains when they stop at stations, as the agency will begin certifying operators who have been trained to use Metro’s Auto Doors function.
The feature enables doors to open automatically when the train stops at the platform.
How Auto Doors Changes WMATA Operations
Currently, operators are required to open and close train doors manually. They’re instructed to stick their head out the window, take a few seconds to verify they are opening the doors on the correct side of the train, and then press a button to open the doors. The process can take up to 15 seconds and happens more than 20,000 times a day across the system.
With Auto Doors, signals at the platform tell the train which side to open automatically when it arrives at each station platform. Operators will still put their heads out of the window to make sure everyone has exited or boarded before manually closing the doors.
“Using Auto Doors eliminates human error from the process of operating our train doors, meaning a safer, smoother trip,” Brian Dwyer COO said. “Anyone who uses Metrorail has experienced the wait, standing at the door wondering when the doors will open. Our customers tell us they want Auto Doors back and this change will improve customer experience and safety.”
Metro has been testing Auto Doors during off-hours for months and the system performed without any safety issues more than 2,500 times. Metro worked with the Washington Metrorail Safety Commission to move forward with this step in its automation program.
More Rail

New York MTA Advances Final Contract for Second Avenue Subway Expansion
Contract Four is the largest in the Second Avenue Subway Phase 2 project and includes construction of station infrastructure, tracks, and signals for the subway expansion, MTA officials said. Work on Contract Four will begin in 2027.
Read More →
San Diego MTS Breaks Monthly Trolley Ridership Record
Agency officials said July’s ridership indicates MTS’s continued recovery from the pandemic.
Read More →
Report Examines NJ TRANSIT Reliability, Funding Challenges
The Garden State Initiative analysis examines the roles of Amtrak infrastructure, fleet management, and agency operations while recommending a more performance-based approach to improving reliability.
Read More →
Stadler, CapMetro Sign Long-Term Rail Fleet Support Agreement
Beginning in 2027, Stadler will provide on-site technical expertise, spare parts support, training, and obsolescence management to help extend the reliability and longevity of CapMetro’s GTW fleet.
Read More →
Biz Briefs: Alstom Lands Canadian Contract, LYT to Supply California TSP, and More
In METRO's latest installment, we take a look at recent news from Complete Coach Works, Beep, FlixBus, and more partnerships making headlines across the transportation sector.
Read More →
CATS Gold Line Marks 5 Years of Service, 2.8M Passenger Trips
With a six-mile expansion planned, the Charlotte streetcar is positioned to connect more neighborhoods and major transit hubs across the region.
Read More →
Why Simulating Pedestrian Movement Has Become Essential for Modern Rail Stations
Pedestrian microsimulation is helping rail planners identify bottlenecks, test station designs, and prepare complex transit hubs for growing passenger volumes.
Read More →
Amtrak Begins Major Construction at New York’s Sunnyside Yard
The new maintenance facility will support Amtrak’s Airo trainsets while improving maintenance efficiency and turnaround times in New York.
Read More →
Chicago Leaders Unveil Plans for O’Hare Airport Express Train
The privately developed project would offer a 15-minute trip between downtown and O’Hare’s Terminal 2, with trains operating every 15 minutes on a dedicated track. The service would use battery-electric trains and three existing freight rail rights-of-way.
Read More →
OCTA Maps Out 30-Year Strategy to Protect Coastal Rail Corridor
The draft feasibility report identifies strategies to protect the coastal rail line for decades as the agency continues near-term stabilization and sand placement efforts.
Read More →