MCI's Coach Critical list starts with 1,000 parts and will include 1,500 by June 2012. The list, compiled with the input of operators of MCI coaches and in-house technical experts, includes both high- and low-volume parts, including those that are sometimes hard to come by.
The bus, which was carrying no passengers at the time, washed up on top of the building during floods triggered by the tsunami.
MBTA would not be allowed to charge passengers if train departs 20 minutes or more after their originally scheduled departure time.
The proposal represents a unique opportunity for the city, which received $2.25 million from Stanford University last year to beef up pedestrian connections between the city and campus, as well as to encourage use of public transportation.
PARTA officials said the cost-saving idea sprung from a weekly meeting between the downtown redevelopment partners where KSU and city officials related that they needed dirt to raise the university’s Esplanade walkway extension.
Focusing on transportation alternatives, such as its Campus Area Bus Service buses, which run on biodiesel and bicycling.
The draft report presented to the five NTSB members will include the following issue areas: survival factors, driver background and human factors, highway design, vehicle factors, motor carrier oversight, and the company operating and safety history.
With an increase of 2.3% over the 2010 ridership, this was the sixth year in a row that more than 10 billion trips were taken on public transportation systems nationwide.