Rail

D.C. DOT issues RFQ for integrated premium transit system

Posted on February 4, 2014

Washington, D.C.’s District Department of Transportation (DDOT) issued a Request for Qualifications (RFQ) to firms interested in submitting Statements of Qualification (SOQs) to design, build, operate and maintain an integrated premium transit system.

The system, which includes a streetcar network, local bus provisions, and both existing and new transit facilities, is designed to link neighborhoods with attractive transportation alternatives, reduce short inner-city automobile trips, and facilitate and encourage economic development and affordable housing options within the District.

The Integrated Premium Transit (IPT) advances key elements of the District’s 30-year transit vision. The IPT will be developed in phases and is comprised of 22-miles of dual/single track fixed guideway, related equipment and facilities, and potentially, up to 15 additional miles of fixed guided track.

Additionally, the IPT encompasses all local bus services within the District. To meet the goals of DC’s Transit Future System Plan, the IPT builds upon segments currently in construction or planning, establishes priorities for planning and scheduling purposes, and creates a robust system with the maximum number of linkages. The incorporation of local bus services allows the District to provide transit services in a multi-modal, integrated and efficient manner.

As part of the IPT Program, new transit facilities and services will be added and existing facilities and services will be modified to meet forecasted ridership demands and economic growth within the District. The IPT is expected to be developed in a number of phases with each phase being comprised of “Streetcar Segments” and “Bus Components.”

The procurement will be conducted as a two-step process with an RFQ followed by an RFP. Prospective proposers will be short-listed based upon their SOQ submissions evaluated against the extensive qualification criteria in the SOQ.

The specific limits of the IPT will be further specified in the Request for Proposals (RFP) which will be issued to the short-listed responding teams. DDOT will host pre-SOQ workshop for interested proposers.

View comments or post a comment on this story. (1 Comment)

More News

Dallas' D2 subway reaches preliminary design milestone

The next phase is preparing a supplemental draft environment impact statement to access potential impacts and benefits of the project.

Bombardier temporarily ceases work at its Canadian facilities

The suspension includes Bombardier’s aircraft and rail production activities in the provinces of Quebec and Ontario.

Sound Transit completes downtown light rail service

The return follows the conclusion of Connect 2020, an 11-week period of major service impacts while construction crews connected the existing system in downtown Seattle to East Link.

FRA seeks to gauge performance, service of intercity passenger rail

The rule would define Amtrak on-time performance and would set forth a minimum on-time performance standard of 80%.

Calif.'s Metrolink lands $10.7M CRISI grant

The grant will partially fund the Burbank Corridor Speed and Safety Improvements Project, which will enhance service on Metrolink’s Ventura County and Antelope Valley lines.

See More News

Post a Comment

Post Comment

Comments (1)

More From The World's Largest Fleet Publisher

Automotive Fleet

The Car and truck fleet and leasing management magazine

Business Fleet

managing 10-50 company vehicles

Fleet Financials

Executive vehicle management

Government Fleet

managing public sector vehicles & equipment

TruckingInfo.com

THE COMMERCIAL TRUCK INDUSTRY’S MOST IN-DEPTH INFORMATION SOURCE

Work Truck Magazine

The number 1 resource for vocational truck fleets

Schoolbus Fleet

Serving school transportation professionals in the U.S. and Canada

LCT Magazine

Global Resource For Limousine and Bus Transportation