NJ Transit approves rail station upgrades
The project’s completion, expected by the end of next year, will bring the total number of accessible Newark Light Rail stations to 12, out of the total 17.
The project’s completion, expected by the end of next year, will bring the total number of accessible Newark Light Rail stations to 12, out of the total 17.
The construction of track is scheduled for completion in 2016.
Takes you on a virtual ride on the 1.2-mile North Shore Connector that shuttles passengers between the new Gateway Station downtown to the elevated Allegheny Station, adjacent to Heinz Field on the North Shore.
Advance’s recently enhanced Sprite 16 and Sprite 16 Pro wet-dry tank vacuums are designed to provide faster and more effective cleaning.
Panasonic System Networks Co. of America enhanced the intelligent functionality of the i-PRO SmartHD WJ-NV200 Network Disk Recorder with an expansion kit that adds age and gender estimation, visitor counting and other functions to the NVR’s embedded face matching technology.
The Series 56 Flasher, an LED hazard warning light, offers noticeable pulsations of ultra-bright illumination with 180 degrees of visibility.
A 300-yard section of a 200-mile high-speed railway that had undergone test runs has collapsed most likely due to heavy rains. The incident is raising concerns over the quality of work on the system.
Reminds riders that stations and vehicles are an extension of city streets and require the same level of vigilance. Recent targeting of smart phones and other high-end electronic devices by thieves are the focus of the 2,000-plus public service ads in place on Muni buses and light rail trains.
Andy Byford, who has been given the new title of CEO, previously worked for rail operators in Australia and the U.K., including a stint as the GM of London's Underground.
The Silicon Valley Berryessa Extension Project, expected to break ground in April, will extend BART by 10 miles and involve the construction of two new stations, in Milpitas and Berryessa, and the procurement of 40 new passenger railcars.
Will provide a permanent communications-based train control test track facility for Metropolitan Transportation Authority New York City Transit.
MBTA would not be allowed to charge passengers if train departs 20 minutes or more after their originally scheduled departure time.
With an increase of 2.3% over the 2010 ridership, this was the sixth year in a row that more than 10 billion trips were taken on public transportation systems nationwide.
Redesign includes Google Transit Trip Planner and more.
Will provide braking equipment, door operating systems, sanitation systems, springs, draft gears and HVAC equipment for 130 new passenger cars being built for Amtrak by CAF USA Inc.
The secure and easy all-access connection to your content.
Bookmarked content can then be accessed anytime on all of your logged in devices!
Already a member? Log In