The contract to renovate to engines to “like new” condition was awarded to Progress Rail Services Corp. of Patterson, Ga. The work covers 41 EMD Model F40PH-2 and F40PHM-2 locomotives that were originally built between 1989 and 1992.
Will maintain 75 passenger cars on the “Caledonian Sleeper” trains, one of only two sleeper services in the UK. Alstom has been providing maintenance services for the “Caledonian Sleeper” trains for more than a decade.
The added caution comes two days after an MTA bus driver was arrested for running over a 15-year-old girl in a crosswalk in Williamsburg, Brooklyn. The criminal charges against the bus driver infuriated the union.
Since it was first announced in March 2014, Cummins has over 5,000 engines running Connected Diagnostics in North American medium- and heavy-duty truck markets, with multiple telematics providers. Expansion is underway to integrate Connected Diagnostics into the commercial marine, power generation, rail, transit bus, motorcoach, construction and mining markets.
Virginia Railway Express; Washington Metropolitan Area Transit Authority; Long Island Railroad; Pinellas Suncoast Transit Authority and Hillsborough Area Regional Transit were recognized.