
Included in the contract are three 60-foot zero-emission, battery-electric Xcelsior CHARGE NG heavy-duty transit buses and four 40-foot battery-electric Xcelsior CHARGE NG transit buses.
Included in the contract are three 60-foot zero-emission, battery-electric Xcelsior CHARGE NG heavy-duty transit buses and four 40-foot battery-electric Xcelsior CHARGE NG transit buses.
The FTA named agencies in Massachusetts, Maryland, Mississippi, Montana, Nebraska, and Texas as recipients of the “Connecting Rural Communities” Award.
The Center for Mobility Equity will embed the Moovit Web Trip planner on their website to allow for easy journey searches.
Starting in 2020, the 14-mile, 11-station BRT will run between Burtonsville and downtown Silver Spring
I recently traveled to Switzerland to see the world’s first autonomous shuttle in operation on regular fixed-route public transportation in mixed traffic and came home with three lessons.
Will keep agency set to deliver more than $900M in planned rail infrastructure improvements over the next several years.
The repair work involved cutting and removing sections of track, gravel, and soil; pipe building; and excavation.
Each bus is equipped numerous safety features including security cameras, an audible safe turn alert system, and curbside and street-side turn aid lights, as well as a factory-installed driver’s barrier to increase bus operator safety.
It is anticipated that Light RailLink service will need to be suspended for approximately two weeks to complete repairs.
Gov. Hogan's transit improvement plan to better connect people in the region to jobs and other transit modes was one of six projects in the Northeast to be recognized.
The secure and easy all-access connection to your content.
Bookmarked content can then be accessed anytime on all of your logged in devices!
Already a member? Log In