METRO Magazine Logo
MenuMENU
SearchSEARCH

European countries agree to establish common hyperloop standards

Will focus on vehicle systems, tube infrastructure and components, overall infrastructure, and communications protocols.

March 12, 2020
European countries agree to establish common hyperloop standards

 

4 min to read


Hardt Hyperlooop vehicle interior rendering. ©Plompmozes

A group of European countries have partnered to create a joint technical committee (JTC) called JTC 20 to define, establish, and standardize the methodology and framework to regulate hyperloop travel systems and ensure interoperability and high safety standards throughout Europe.

Ad Loading...

The consortium of European and Canadian hyperloop companies responsible for driving the initiative around international standardization comprises Hardt Hyperloop (from the Netherlands), Hyper Poland (from Poland), TransPod (from Canada, with offices in Italy and France), and Zeleros Hyperloop (from Spain).

As the hyperloop industry continues to grow with increased interest and more players entering the market, the consortium expects there will eventually be many disparate approaches to standards and operational principles. The potential impact this may have on interoperability of infrastructure, rolling stock, signalling, and other subsystems is substantial — it will become difficult and costly to transport passengers and freight from one country to another, due to dependency on the particular and unique hyperloop system adopted in each location. By developing common standards, specifications, and approaches, JTC 20 will help to mitigate potential challenges to implementation across the continent.



Rendering of Netherlands-based Hardt Hyperloop vehicle. Hardt

The proposal for the creation of the technical committee was a joint effort by the national standardization organizations of Spain (UNE) and the Netherlands (NEN). JTC 20 will comprise working groups focusing on various components of hyperloop systems including vehicle systems, tube infrastructure and components, overall infrastructure, and communications protocols. The consortium of hyperloop companies responsible for initiating the creation of JTC 20, along with members from various national standardization organizations and experts from a variety of industries, will participate in the working groups to lend technical and geo-specific expertise.  

Concurrently, a network of hyperloop research centers is already in the planning stages and is slated to begin operation in the next few years, in France, Poland, Spain, and the Netherlands. They will serve as research sites for the testing and validation of the technologies and standards coming out of JTC 20. Following successful validation, the recommendations will be presented in a legislative proposal to be brought to the European Parliament and Council of the European Union.  

Testing facility
Europe’s first facility to test hyperloop at high speeds will be built in the Dutch province of Groningen. The new European Hyperloop Center (EHC) will be open to hyperloop developers from all over the world. This will promote cooperation, in order to accelerate the development of a technology that could offer a clean alternative to air travel.

Ad Loading...

Construction of the EHC will start in 2020 and is expected to be completed in 2022. Tests conducted at the EHC will determine whether the hyperloop is a realistic alternative to short- haul flights. Travel by hyperloop is CO2 neutral and can provide a sustainable solution for the growing global number of passengers and amount of freight.

The EHC will consist of a two-mile test track, making it the first facility in Europe to test this revolutionary transport system at high speeds. The EHC will also host a Learning Center that will focus on European standardisation, safety standards and the passenger travel experience.


Hardt
Hardt Hyperloop, located in The Netherlands, was founded in 2016. In 2017 Hardt won the international hyperloop competition by Elon Musk’s SpaceX. Hardt Hyperloop’s partners include: InnoEnergy, Koolen Industries, Schiphol Airport, the Dutch Railways, Deutsche Bahn and BAM, Tata Steel and IHC.  

Hyper Poland
Hyper Poland is developing an innovative approach to hyperloop in three steps in which the first is magrail technology that can be deployed on existing railway infrastructure. The company consists of a multidisciplinary team of experts with experience gained from among others Airbus, Bombardier, Shinkansen. Hyper Poland team was the finalist of the SpaceX Hyperloop Pod Competition (2017) and finalist of Build Earth Live Dubai (2016). The company`s main partners include Microsoft, Railway Research Institute, Transfer Multisort Elektronik, National Center for Research and Development and the Warsaw University of Technology. In 2019, Hyper Poland was classified by Lufthansa Innovation Hub among 150 top mobility startups.  

TransPod
Toronto, Canada-based TransPod’s goal is to disrupt and redefine commercial transportation between major cities in developed and emerging markets. The startup was founded in 2015 to build the world’s leading hyperloop system to connect people, cities, and businesses with high-speed transportation that is affordable and environmentally sustainable. 

Zeleros
Zeleros (Spain) is developing a scalable hyperloop transport system that minimizes infrastructure costs by integrating the technology in the vehicles. Its partners include technological firms (Altran), operators (Renfe, F. ValenciaPort) and researchers (Universitat Politècnica de València, CIEMAT), and it is backed by Silicon Valley’s Plug&Play Tech Center, EIT Climate-KIC, and Spain’s key transport associations. The founders were doubly awarded by Elon Musk in 2016.

More Rail

An overhead rendering of the Austin Transit Partnership rail system.
Railby StaffApril 16, 2026

Austin Transit Partnership Names Contractor for Light Rail Operations Facility

The ATP board’s approval of the KAP team enables ATP to begin pre-construction activities, including advancing design, initiating permitting, and preparing the site for future construction.

Read More →
A Coach USA Van Hool CX 45 delivered by ABC Companies.
Busby StaffApril 15, 2026

ABC Delivers Van Hools to Coach USA and More in Biz Briefs

In METRO's latest installment, we take a look at the latest news from suppliers including Moovit, CAF, and more.

Read More →
A photo of an Amtrak train with a logo
Technologyby StaffApril 15, 2026

Amtrak Advances Plan for New Long-Distance Fleet

The railroad has issued a formal request for proposals to manufacturers for more than 800 new passenger railcars that will serve 14 long-distance routes nationwide.

Read More →
Ad Loading...
A headshot of Inez Evans Benson
Busby Alex RomanApril 15, 2026

Inez Evans Benson on Rethinking Transit Through Customer Experience

The WSP leader discusses why agencies must look beyond satisfaction metrics and take a more holistic, community-driven approach to service.

Read More →
NJ TRANSIT's new Multilevel III commuter railcar manufactured by Alstom
Technologyby StaffApril 14, 2026

Alstom Delivers First Multilevel III NJ TRANSIT Commuter Railcar

The delivery marks the first car in a 374‑vehicle order and begins the arrival of a new generation of higher‑capacity, more reliable, and more comfortable trains for one of the country’s busiest commuter rail systems.

Read More →
A BART train on the tracks.
Railby StaffApril 13, 2026

San Francisco's BART Breaks Multiple Records for Post-Pandemic Ridership in March

BART recorded 5,403,140 exits in March, making it the highest monthly ridership since the pandemic and surpassing the previous high set in October 2025 (5,346,890 exits).

Read More →
Ad Loading...
Ribbon cutting photo celebrating SEPTA's new Ardmore Station
Railby StaffApril 13, 2026

Philadelphia's SEPTA Celebrates New Ardmore Station

The station was rebuilt as part of SEPTA’s Station Accessibility Program, making it fully ADA accessible with new elevators, ramps, and high-level platforms.

Read More →
Two Metra locomotives on rail tracks.
Railby StaffApril 10, 2026

Metra Reaches New 10-Year Agreement with BNSF

The announcement highlights the long-standing partnership between the Class I railroad and the commuter rail system, dating back to Metra's creation in 1983.

Read More →
Ribbon cutting at Siemens' new North Carolina facility.
Railby StaffApril 9, 2026

Siemens Opens North Carolina Railcar Manufacturing Facility

Site construction is complete, production is underway, and the first locally built passenger coaches are on track for delivery in Summer 2026.

Read More →
Ad Loading...
Two MBTA railcars in station.
Railby StaffApril 9, 2026

MBTA Completes Key Red Line Signal Upgrade Weeks Early

Crews completed a significant portion of the testing required before commissioning the new, digital signaling system, which will bring important upgrades that strengthen Red Line service reliability for riders and provide Red Line Operations the ability to route trains more quickly, turn trains around faster, and recover from unplanned disruptions more efficiently, said MBTA officials. 

Read More →