Maryland Transit Lands $213.6M for Light Rail Vehicle Replacement
The State of Maryland is providing $90 million in matching funds and allocating $127.6 million in federal formula funds to the project to complement the federal grant

The agency’s existing light rail fleet includes standard, 95-foot railcars dating back to the system’s launch in 1992.
Photo: MDOT MTA
The Maryland Transit Administration (MTA) was awarded $213.6 million in grant funding from the Federal Transit Administration’s Rail Vehicle Replacement program. The grant will support the MTA’s efforts to replace all 52 aging light rail vehicles in its fleet with new, modern railcars.
The State of Maryland is providing $90 million in matching funds and allocating $127.6 million in federal formula funds to the project to complement the federal grant, which was made possible by the Infrastructure Investment and Jobs Act (IIJA).
“Safe, reliable, and accessible transit is fundamental to the economic success of the Baltimore region and its people,” said Maryland Transit Administrator Holly Arnold. “This grant will help to ensure that Baltimore and Maryland continue to provide an equitable, modern transit system for years to come.”
MTA’s Need for Railcar Funding
The $450 million light rail vehicle replacement project is identified as a high priority in the agency’s Transit Asset Management Plan and Capital Needs Inventory, and is included in the Baltimore Metropolitan Council’s long-range plan.
The agency’s existing light rail fleet includes standard, 95-foot railcars dating back to the system’s launch in 1992. All vehicles have reached the end of their useful life, or will be reaching the end of their useful life within five years — a timeframe required by the Rail Vehicle Replacement program.
The proposed replacement for each light rail car in the fleet is a modern, low-floor vehicle allowing for easier, more accessible boarding, making the system more efficient and convenient to use for all passengers.
The project will also improve the frequency and reliability of the light rail system by reducing the number of vehicles that are regularly out of service for repairs.
Benefits of the Project
The project’s benefits include:
Improved accessibility and mobility: Elimination of steps up to the railcars will be more accommodating to all riders, including individuals using wheelchairs, mobility devices, or pushing strollers.
Increased frequency: New, more reliable trains will allow for shorter headways, reducing wait times for riders.
Enhanced safety and comfort: The introduction of new trains will avoid safety challenges associated with aging vehicles and provide a more comfortable riding experience for passengers.
Lower maintenance costs, higher performance: Ensuring all light rail vehicles are in a state of good repair will reduce maintenance costs and improve service performance through the increased availability of trains.
Improved equity: Investment in the light rail system will benefit its more than 13,000 daily riders, including those from the 17 stations located in locations designated as Areas of Persistent Poverty.
The IIJA has allocated $1.5 billion through 2026 to create the FTA’s Rail Vehicle Replacement program. To date, that program has invested over $700 million in projects across the country to replace aging railcars and ensure safe and accessible travel to the communities that rely on them.
More Rail

New York MTA Leverages Zoning Program to Advance Station Accessibility
Accessibility enhancements at Nevins St Station will be financed through a development agreement tied to the MTA's Zoning for Accessibility initiative.
Read More →
Virginia's $28.5B Transportation Plan Targets Transit and Rail
Approved by the Commonwealth Transportation Board, the program supports ongoing infrastructure projects while providing new investments in transit, state of good repair and transportation alternatives.
Read More →
DOT: Brightline Corridor Incidents Fall 30% Following Federal Safety Upgrades
Safety improvements funded through a $25 million federal investment are credited with reducing trespassing and train-vehicle collisions along the Brightline Florida corridor.
Read More →
D Line Expansion Fuels Growth Across LA Metro's Rail System
Weekend rail ridership was especially strong, soaring 18% as riders embraced expanded access to jobs, entertainment, dining, and cultural destinations, said the agency. Total system ridership for May, including bus and rail, was 26,966,657.
Read More →
Southern California's Metrolink Debuts Contactless Fare Payment Pilot
Customers traveling between Redlands and Los Angeles can now tap their preferred payment method, including a credit or debit card, mobile wallet, or wearable device, at station validators before boarding and again while exiting.
Read More →
California's BART Approves FY27 Budget While Maintaining Service Levels
The budget covers July 1, 2026, through June 30, 2027, a period when pandemic emergency funds run out, the District faces a structural deficit of $375 million, and a regional transit funding measure may appear on the November ballot.
Read More →
Penn Station Transformation Advances with Design Unveiling
The historic redesign will transform the busiest transit hub in the Western Hemisphere from the tracks to the street level, creating a more efficient, cleaner, and functional experience for more than 600,000 daily commuters and millions of visitors.
Read More →
Second Avenue Subway Phase 2 Advances into Major Construction Stage
New York Governor Kathy Hochul joined leadership from the MTA, elected officials, and Harlem community leaders to break ground on the major construction stage of the transformative Second Avenue Subway Phase 2 project.
Read More →
The Invisible Infrastructure of Passenger Flow
What a seat reservation system on Austria’s Railjet trains reveals about the future of rider experience, and why U.S. agencies should pay attention.
Read More →
Caltrain Board Approves FY27 Budget, Endorses Efficiency Measures
The move ensures Caltrain service will continue operating as usual in the near term, but long-term financial challenges remain for the rail agency absent a new revenue source.
Read More →