METRO Magazine Logo
MenuMENU
SearchSEARCH

Maryland Transit Lands $213.6M for Light Rail Vehicle Replacement

The State of Maryland is providing $90 million in matching funds and allocating $127.6 million in federal formula funds to the project to complement the federal grant

February 21, 2024
Maryland Transit Lands $213.6M for Light Rail Vehicle Replacement

The agency’s existing light rail fleet includes standard, 95-foot railcars dating back to the system’s launch in 1992.

Photo: MDOT MTA

3 min to read


The Maryland Transit Administration (MTA) was awarded $213.6 million in grant funding from the Federal Transit Administration’s Rail Vehicle Replacement program. The grant will support the MTA’s efforts to replace all 52 aging light rail vehicles in its fleet with new, modern railcars.

The State of Maryland is providing $90 million in matching funds and allocating $127.6 million in federal formula funds to the project to complement the federal grant, which was made possible by the Infrastructure Investment and Jobs Act (IIJA).

Ad Loading...

“Safe, reliable, and accessible transit is fundamental to the economic success of the Baltimore region and its people,” said Maryland Transit Administrator Holly Arnold. “This grant will help to ensure that Baltimore and Maryland continue to provide an equitable, modern transit system for years to come.”

MTA’s Need for Railcar Funding

The $450 million light rail vehicle replacement project is identified as a high priority in the agency’s Transit Asset Management Plan and Capital Needs Inventory, and is included in the Baltimore Metropolitan Council’s long-range plan.

The agency’s existing light rail fleet includes standard, 95-foot railcars dating back to the system’s launch in 1992. All vehicles have reached the end of their useful life, or will be reaching the end of their useful life within five years — a timeframe required by the Rail Vehicle Replacement program.

The proposed replacement for each light rail car in the fleet is a modern, low-floor vehicle allowing for easier, more accessible boarding, making the system more efficient and convenient to use for all passengers.

Ad Loading...

The project will also improve the frequency and reliability of the light rail system by reducing the number of vehicles that are regularly out of service for repairs.

Benefits of the Project

The project’s benefits include:

Improved accessibility and mobility: Elimination of steps up to the railcars will be more accommodating to all riders, including individuals using wheelchairs, mobility devices, or pushing strollers.

Increased frequency: New, more reliable trains will allow for shorter headways, reducing wait times for riders.

Ad Loading...

Enhanced safety and comfort: The introduction of new trains will avoid safety challenges associated with aging vehicles and provide a more comfortable riding experience for passengers.

Lower maintenance costs, higher performance: Ensuring all light rail vehicles are in a state of good repair will reduce maintenance costs and improve service performance through the increased availability of trains.

Improved equity: Investment in the light rail system will benefit its more than 13,000 daily riders, including those from the 17 stations located in locations designated as Areas of Persistent Poverty.

The IIJA has allocated $1.5 billion through 2026 to create the FTA’s Rail Vehicle Replacement program. To date, that program has invested over $700 million in projects across the country to replace aging railcars and ensure safe and accessible travel to the communities that rely on them.

More Rail

Operation Lifesaver Rail Safety Education logo over railroad tracks background, representing rail safety awareness initiatives.
Railby News/Media ReleaseMay 4, 2026

Operation Lifesaver Awards Rail Safety Outreach Funds in 12 States

Operation Lifesaver awarded $220,200 in grants to 12 states to support rail safety campaigns focused on grade crossing awareness and trespass prevention.

Read More →
Caltrain trains on tracks
Railby StaffMay 1, 2026

Caltrain Survey Shows Record-High Rider Approval

The survey showed that commute trips still make up the majority of ridership, with most riders boarding 2 to 3 days a week, reflecting hybrid work schedules. Two-thirds of Caltrain riders have access to a car, while 37% of Caltrain riders are considered low-income.

Read More →
A person working on a bus
ManagementMay 1, 2026

Data-Driven Maintenance: Focusing Effort Where It Matters Most

Advances in data and analytics are giving transit agencies new opportunities to refine maintenance practices, improve efficiency and make more informed decisions about asset performance.

Read More →
Ad Loading...
Carmen C. Cham of HNTB
Managementby Alex RomanApril 29, 2026

How Transit Architecture Is Reshaping the Rider Journey

In this Consultant Roundtable, Carmen C. Cham shares insights on how agencies can create spaces that are intuitive, connected and built for long-term impact.

Read More →
A Red Line Rendering
Railby StaffApril 27, 2026

Chicago Kicks Off Historic Red Line Extension at Michigan Avenue Station Site

The Red Line Extension Project will provide the Far South Side of Chicago with rapid rail transit for the first time by extending the Red Line by 5.5 miles from 95th Street to 130th Street, including the construction of four new Red Line stations at 103rd, 111th, Michigan, and 130th streets.

Read More →
Trains at railroad crossings
Security and Safetyby StaffApril 27, 2026

USDOT Invests $1.1B to Enhance Safety Infrastructure at Railroad Crossings

Every year, more than 2,000 incidents and 300 fatalities occur at railroad crossings nationwide. 

Read More →
Ad Loading...
Siemens and LK Comstock photo for Fulton-Liberty Lines
Security and Safetyby StaffApril 27, 2026

NYC’s Fulton–Liberty Lines Get Digital Signal Upgrade from Siemens and L.K. Comstock

The Siemens CBTC System, Trainguard MT, in compliance with New York Subway Interoperability Interface Specifications, enables trains to run as close as 90 seconds apart, using next-generation signaling and continuous communication to keep operations moving seamlessly.

Read More →
WMATA 7000-series railcars at Navy Yard
Managementby StaffApril 24, 2026

WMATA Adopts FY2027 Budget, Boosts Service Without Raising Fares

While recognizing regional economic constraints and continuing to improve service, the budget increases the jurisdictional subsidy to less than 1.8%, significantly below the inflation rate and the 3% regional target, said agency officials.

Read More →
Denver RTD's A Line with passengers
Railby StaffApril 23, 2026

Denver's RTD Celebrates 10th Anniversary of the A Line

With more than 59,400,000 boardings since the service’s debut, the A Line’s utilization surpassed that of all other RTD rail services in 2025, the agency reported.

Read More →
Ad Loading...
Passengers on a public transit vehicle.
Railby StaffApril 21, 2026

Virginia DRPT Releases Draft Six-Year Program for Transit, Rail Investments

The plan outlines funding for transit operations, capital projects, and freight and passenger rail initiatives, as state officials seek public input on priorities shaping mobility and infrastructure across the Commonwealth.

Read More →