Rail

Bombardier to supply 17 additional locomotives to New Jersey

Posted on January 3, 2018

The dual-power locomotives are capable of operating under both diesel power and alternating current electric power from overhead sources.
The dual-power locomotives are capable of operating under both diesel power and alternating current electric power from overhead sources.

The New Jersey Transit Corp. (NJ TRANSIT) exercised an option for 17 additional Bombardier ALP-45 dual-power locomotives. This second call off is valued at approximately $160 million and is based on a contract for 26 locomotives signed in 2008.

NJ TRANSIT exercised a first option for nine units in 2011 and the contract includes options for up to 37 more units.

"This option order is confirmation of the confidence NJ TRANSIT has in our highly innovative, energy efficient, reliable, and safe equipment," said Benoit Brossoit, president, Americas Region, Bombardier Transportation. "The new locomotives will comply with the EPA's Tier 4 Exhaust Limits, making them environmentally friendly which is especially important in a metropolitan area like New York."

The dual-power locomotives are capable of operating under both diesel power and alternating current electric power from overhead sources. Their flexible power system enables the locomotives to operate across the entire NJ TRANSIT rail system, which includes both electrified and non-electrified lines, thus allowing passengers to ride a single train between New Jersey and New York Penn Station without having to change trains. Their introduction in 2011-2012 at NJ TRANSIT and the then Agence Métropolitaine de Transport in Montreal (now named Réseau de transport métropolitain) marked a first for this technology in North America.

The locomotives will be manufactured at Bombardier sites in Germany and Poland. Delivery is scheduled to start in November 2019.

View comments or post a comment on this story. (0 Comments)

More News

Bombardier lands contract to provide BiLevel railcars

The two contracts represent a combination of eight cab cars and 20 coaches and include options for 33 additional railcars.

OC Streetcar awards $45M operations, maintenance contract

The line will run on a 4.1-mile route through Santa Ana and Garden Grove. It is scheduled to begin testing and operations in 2022.

Amtrak says it needs $1.475B to maintain minimum service levels

The railroad has seen a dramatic decline in demand for service since the pandemic, and is expecting ridership to only return to approximately 50% in FY 2021.

Veovo unveils social distancing solution for passenger rail

It shows how people move into, out of, and between stations, average wait times, and even occupancy on trains.

RTA identifies costs, potential funding strategies for Metra service improvements

This study was completed prior to the COVID-19 pandemic, which resulted in temporary changes to the NCS schedule.

See More News

Post a Comment

Post Comment

Comments (0)

More From The World's Largest Fleet Publisher

Automotive Fleet

The Car and truck fleet and leasing management magazine

Business Fleet

managing 10-50 company vehicles

Fleet Financials

Executive vehicle management

Government Fleet

managing public sector vehicles & equipment

TruckingInfo.com

THE COMMERCIAL TRUCK INDUSTRY’S MOST IN-DEPTH INFORMATION SOURCE

Work Truck Magazine

The number 1 resource for vocational truck fleets

Schoolbus Fleet

Serving school transportation professionals in the U.S. and Canada

LCT Magazine

Global Resource For Limousine and Bus Transportation