Key actions planned in the new year are building the first units of 70 new electric locomotives and 130 new single-level long-distance cars, the national roll-out of eTicketing to all trains, and the further integration and advancement of Northeast Corridor planning efforts to improve the existing corridor and develop a high-capacity, next-generation high-speed rail system.
Read More →
As cycling's popularity as a commuting option continues to grow, Metrolink is introducing bike cars into weekday service on 34 trains to provide for additional bike storage. Cyclists gathered in Orange County for the inaugural ride.
Read More →The new railcars will be qualified to operate at speeds up to 125 mph and meet all of the requirements of Amtrak for operation on the Penn Line and CSX for operation on the Camden and Brunswick lines.
Read More →Offers a full range of mechanical services for passenger and freight railroad equipment including overhauls and wreck repairs, wheel maintenance, air brake service, seat repair and replacement, electronic testing and maintenance, day-to-day equipment servicing, rolling stock engineering, and positive train control implementation and advising.
Read More →Caught by the unexpected rise of Assunpink Creek, SEPTA's rail operations managers realized too late that the trains could be in harm's way. They say they will shuffle cars in SEPTA's 365-car fleet to deal with the shortage created by the missing 12 on the Trenton line.
Read More →The Florida Department of Transportation ordered 14 BiLevel railcars. The contract is valued at approximately $41 million. Deliveries are planned between May and August 2013.
Read More →In all, 380 new cars will replace a fleet that is well beyond its useful life and has been plagued with weather-related component failures this winter resulting in crowded trains and below normal on-time performance.
Read More →
Ten cars will be put into service immediately across the Metrolink System. As more cars are assembled, tested and approved for service, they will be used to augment Metrolink's current fleet.
Read More →The five-year, $298.1 million contract is being awarded to CAF USA, which is creating 575 jobs to perform manufacturing and final assembly work at its plant in Elmira, N.Y. The first car is scheduled to roll off the assembly line in October 2012.
Read More →Through a competitive RFP process, CTA selected Bombardier Transit Corp. located in Bensalem, Penn. for the contract.
Read More →