
Concurrently, Brightline has provided authorization for Tri-Rail trains to enter the MiamiCentral Station as part of the testing.
Read More →
Initial tests will be conducted between Santa Clara and College Park Stations on the Santa Clara Drill Track. Test runs will expand to the main track, between San Antonio and San Jose Diridon stations this summer.
Read More →
The new low-floor vehicles will provide easier access at every doorway, a spacious seating design, and large windows for better light and views.
Read More →
The Zero-Emission Bus System Design and Investment Planning Study will develop and create standards and best practices that will be critical as the agency continues to move toward a 100% zero-emission bus fleet.
Read More →
The test is to ensure the trains meet all clearance requirements to operate safely along the corridor.
Read More →
The BYD C10MS joins a full range of BYD zero-emission vehicles that have passed the Altoona test.
Read More →
The demonstration unit is the same make and model ABC began delivering to customers in early 2021 and is used for ongoing data collection.
Read More →
The agency is seeking to buy 10, 40-foot-standard-length buses from multiple manufacturers to test different bus and charging technologies and assess their performance.
Read More →
The project began in 2016 as a research partnership with the Technical University of Berlin.
Read More →
The shuttle uses an array of sensors outside of the vehicle providing a full 360-degree view of the environment.
Read More →