Projects are expected to spur economic growth in the community by creating 60,000 direct and indirect jobs under the full $1.46 billion contract.
Read More →Disabled veterans simply need to show the proper identification card to bus operators of any fixed-route service in the state, including Metro Transit and suburban transit providers in the Minneapolis/St. Paul area.
Read More →Falls Road Light Rail station improvements include increasing parking capacity from 97 spaces to 197 spaces as well as new lighting, landscaping and signs.
Read More →
Tests will be conducted on an almost daily basis until the section opens September 14. The tests are designed to evaluate the operation of the new light rail track and to familiarize rail operators with the operating characteristics of the trains on the new line.
Read More →Line has seen 20.5 million rides taken and more than 50 new businesses sprout up around the alignment.
Read More →Construction contract, valued at $1.46 billion, is projected to generate approximately 60,000 direct and indirect jobs before the four light rail lines, approximately 20 miles, are completed.
Read More →Construction on the new MAX line could begin in 2011 and be completed by 2015.
Read More →Supports transit system's goal of recovering 52 percent of annual operational costs by 2017.
Read More →Responsible for overall design, integration and installation of the new surveillance system, which includes remotely controlled cameras that can focus on rail station platforms, equipment and surrounding areas.
Read More →Analyses conducted by the FTA, an engineering firm and Sound Transit all concluded that, despite forged information related to the grade of steel used in some guideway foundations, the system is structurally sound.
Read More →