Loading data...
A subway network under construction in Nanchang is in a sparsely populated area, and critics have called the project an extravagance.
Read More →The Sugar House Streetcar project construction costs are estimated to be approximately $37 million. HDR will provide preliminary engineering and final design services for the track work, structures, drainage, utility relocations, stations, street reconstruction and at-grade crossings.
Read More →By running the soccer-themed, family focused commercial during the pre-World Cup media blitz and on iconic Hispanic programs such as Sábado Gigante, Amtrak’s goal is to connect with the Hispanic audience and pique their interest in train travel.
Read More →Critics say the MTA missed an opportunity to work with developers to incorporate residential space into ancillary building plans that will house ventilation equipment and allow for evacuation from the subway.
Read More →Trams feature platform-height floors, air conditioning, a CCTV system, and onboard audio and visual information. Each tramset will accommodate more than 380 passengers.
Read More →Ninety-nine percent of the facility has now been cleaned and the infrastructure has been restored, with production resuming at the Bautzen site in September. Since then, welding production has gradually increased. Other sections will follow within the next weeks. Full production readiness is expected to be achieved by the end of the year.
Read More →Will provide braking equipment, door operating systems, sanitation systems, springs, draft gears and HVAC equipment for 130 new passenger cars being built for Amtrak by CAF USA Inc.
Read More →The advanced Allied Telesis network at the heart of the Clipper card system has created a solid foundation that will enable Santa Clara VTA to expand its offerings to include additional card readers, passenger Wi-Fi and more.
Read More →After a guard was attacked for asking a man to stop walking between the train cars, the agency is pushing for bans on riders charged and convicted for violent attacks on the transit system.
Read More →Analysis of the collision that occurred between two Washington Metropolitan Area Transit Authority trains on the Red Line on June 22, 2009, along with conclusions and a determination of probable cause, will be presented at the July 27 board meeting.
Read More →