Loading data...
Phase 1 of the proposed rail service would cover 41 miles connecting the existing Dublin/Pleasanton BART Station to the proposed ACE North Lathrop Station.
Read More →We asked the experts to assemble their recommendations for transit officials and city leaders looking to revolutionize transit in their communities. This guide is the result.
Read More →RTD has reported five instances of copper wire being stolen along light rail alignments over the last week alone.
Read More →Denver’s Regional Transportation District is encouraging the public to report unusual activity observed near rail crossings and signals due to continued copper wire theft.
Read More →The OCTA Board selected HDR Engineering Inc. as the firm to lead the South Coast Rail Infrastructure Feasibility Study and Alternative Concepts Analysis.
Read More →The new regulations require performance-based inspections, a process designed to minimize rail defects, which will generally result in an increase in tests performed over a designated area of track.
Read More →Riders say the electronic alerts for the Northstar Commuter line are often uninformative and arrive too late to be useful. A spokesman for Metro Transit says the system is still in beta testing and was rolled out before it was truly ready when delays on the line became frequent.
Read More →Ten years ago, the agency had a general concept of building a streetcar along Wilkinson Boulevard toward the city's airport, but CATS CEO John Lewis wants a more detailed study to determine whether that’s the best option.
Read More →The companies are reportedly making progress on one joint venture for their rolling stock operations, which would be controlled by Montreal-based Bombardier, and another for signaling, in which Siemens would have a majority
Read More →State Department of Taxation officials have pointed to a lag in processing tax returns as a key reason for the swings. HART officials, meanwhile, said they still don’t fully understand what’s causing the swings.
Read More →