Loading data...
The seven-year construction management contract awarded to CH2M Hill and Jacobs Engineering has a value of $75.5 million.
Read More →While the agency’s light rail ridership forecasts seem overly optimistic and its citizen-oversight panel is insubstantial, the agency did adapt well to the recession.
Read More →The improvements covered by the grant will save more than an estimated $80,000 a year in utility and operations costs and allow the agency to leverage an additional $175,000 in utility rebates.
Read More →Prompted by overflow of cars in lots. Supporters hope a fee would encourage more people to carpool, bike, walk or ride a bus to the lots, freeing slots for others.
Read More →The latest second quarter ridership numbers for 2012 show link up 10% over the second quarter in 2011. Link carried an estimated 2.19 million riders in the second quarter of 2012 compared to 1.98 mill
Read More →Metal scavengers have stolen copper wires from SEPTA's tracks. The agency is spending up to $500,000 yearly to repair and replace the damaged equipment.
Read More →There are now twin tunnels running 3.1 miles between downtown Seattle and the University of Washington. The contractor team, JCM U-Link Joint Venture, mined two tunnels about a mile long between the site of the future Capitol Hill Station and downtown Seattle. The project is about halfway complete and scheduled to open in 2016.
Read More →From end-to-end, about four miles of cable was stolen by thieves who seemed to have ripped the wire from inside an elevated guideway that supports the tracks.
Read More →Officials say that it appears, anecdotally, to have “changed the way people behave.” The agency has also replaced sound walls that blocked pedestrian views of trains and added pedestrian swing gates and extra signs to improve safety at rail crossings.
Read More →