Loading data...
Will prepare final design documents for the second phase of the expansion, which spans more than a mile of the established Rampart/St. Claude transit corridor in the heart of the city and serves the French Quarter as well as other historic neighborhoods.
Read More →Estimates a BRT system would cost $136 million to construct, less than half the $275 million required for streetcars. The number of trips riders would make on either system would be about the same, 4,500 average weekday trips on BRT versus 4,800 on streetcars in the first year.
Read More →Currently, a shuttle is the university's only transportation system to the Med School and affiliated hospitals.
Read More →Was a member of the SFMTA board of directors for more than four years and was especially admired for his transit expertise and passion for public transportation. His career in transportation spanned 44 years, including 25 years with the Sacramento Regional Transit District.
Read More →The streetcar line is expected to be completed by 2015.
Read More →In 2010, the RTA received a $45 million TIGER grant from the U.S. Department of Transportation to build a streetcar loop on Loyola Avenue from Canal Street to the Union Passenger Terminal (UPT), a 1.4-mile route through the central business district.
Read More →To meet customer demand for the new low-floor streetcar market, Thermo King is launching a custom mid-size HVAC unit to provide a reliable, compact and efficient solution. Engineers at Thermo King worked closely with key railcar manufacturers to produce this new unit.
Read More →Vehicle is a 100 percent low-floor streetcar powered by e-Brid, a propulsion technology that enables operation powered by overhead catenary or on-board lithium-ion batteries.
Read More →The City of Charlotte has acquired three vintage streetcars to be used for the project, which is funded through an FTA grant program. The Charlotte Area Transportation System will operate and maintain the streetcar system once it is constructed.
Read More →The Sugar House Streetcar project construction costs are estimated to be approximately $37 million. HDR will provide preliminary engineering and final design services for the track work, structures, drainage, utility relocations, stations, street reconstruction and at-grade crossings.
Read More →