Board discovered that a failure occurred in which a spurious signal generated by a track circuit module transmitter mimicked a valid signal and bypassed the rails via an unintended signal path. Issued nine safety recommendations.
Read More →The contract is valued at a total of $133 million. The company will provide the design, manufacture, supply, installing, testing and commissioning of the train control and signaling system for line 1 and 2 of the new Bangalore metro system.
Read More →Contract, valued at $16.9 million, relates to a 36-mile extension to two sections of the Ankara-Istanbul high-speed link.
Read More →