
Will be built at the factory in Sacramento, Calif., and are due to be delivered starting in summer 2015. The full order is to be completed by December 2016.
Read More →
The contract is valued at approximately $63 million. Deliveries are planned in the second half of 2016.
Read More →Designed to handle our heaviest passenger loads, the agency will deploy 23 of these streamlined buses in August and September.
Read More →
The TS30 is a fully integral, stainless steel chassis, mid-sized coach that provides the same level of comfort and amenities as a full-size coach.
Read More →Contains a firm order of 29 buses with options for an additional 21 buses. All buses are expected to be delivered by the fourth quarter of 2014.
Read More →
The 57 passenger coaches are powered by Detroit DD13 engines coupled to Allison B500G4 transmissions and are equipped with Iteris Lane Departure Warning systems, electronic stability control and three-point seat belts.
Read More →
Safety features include three-point passenger seat belts, Electronic Stability Control, a fire suppression system and air-pressure tire monitoring.
Read More →The 25 CNG buses are anticipated to begin production in the fourth quarter of 2013 and all buses are expected to be delivered in the first quarter of 2014.
Read More →Between 2006 and 2012 New Flyer has built and delivered 70, 40-foot CNG buses for GET Transit, which currently has an active fleet of 88 heavy duty buses.
Read More →The contract for 96 Movia vehicle includes an option for up to 80 further vehicles. The firm order is valued at approximately $771 million.
Read More →