Under a $184 million contract, the supplier will replace the agency’s existing fare collection systems. The new system will let riders continue to use SmarTrip cards, while expanding fare payment to chip-enabled credit cards, federal government ID cards, and mobile phones using near field communications.
Read More →
FTA provided $44.8 million in funding specifically to help fund the replacement of the 1000-series railcars. In addition, the agency has committed $58.3 million for 64 new railcars through a grant program.
Read More →
The report, which analyzes the D.C. Metro system, proposes that greater reliability of transit schedules could motivate more people to leave their vehicles at home and ride the bus.
Read More →The contract contains a firm order for 85 BRT-styled diesel-electric hybrid 42-foot buses and options of up to 498 42-foot BRT-styled diesel-electric hybrid or CNG buses, and up to 71 (142 EUs) 60-foot diesel-electric hybrid buses over a five-year contract period.
Read More →Every 20 seconds to 30 seconds, each individual Transit Screen receives the current arrival times for each transit agency at all stops within walking distance of its location.
Read More →Momentum, the model station, will enable Metro to test several design concepts in a single station, with improved lighting, better information and improved customer convenience. Some of the concepts being considered include high-output light fixtures to direct light to the vault ceiling, and a new information wall enclosing fare machines, ATMs, maps and digital screens.
Read More →Momentum, the model station, will enable Metro to test several design concepts in a single station, with improved lighting, better information and improved customer convenience. Some of the concepts being considered include high-output light fixtures to direct light to the vault ceiling, and a new information wall enclosing fare machines, ATMs, maps and digital screens.
Read More →Plans to spend $215 million over the next five years to replace 100 4000-series railcars under a contract with Kawaski. The cars have had numerous problems with brakes, lights and air conditioning. An overhaul for the cars would cost about $1.5 million per car.
Read More →David Kubicek, who was instrumental in improving safety on the Metrorail, will leave the Washington Metropolitan Area Transportation Authority on March 18. It is not clear what he plans to do next.
Read More →LivingSocial will underwrite at least one hour and up to two hours of extended Metrorail service for all rides originating from Navy Yard-Ballpark station after home evening post-season games in October and November.
Read More →