Loading data...
The two trains were on a single-track line at the time of the crash, between the coastal towns of Bari and Barletta.
Read More →The total value of the 3.1-mile-long line, also called Route 2020, is $2.8 billion.
Read More →The diesel multiple units will be built in Alstom’s plant in Salzgitter and delivered by May 2019 to run on the RE Ulm-Aalen, RB Ulm-Langnau, and RB Ulm-Munderkingen lines.
Read More →Bombardier's retraction project is part of LU's larger Central Line Improvement Program, which will bring a number of passenger-focussed improvements and is expected to significantly reduce customer-affecting failures on the Central Line fleet.
Read More →Hyperloop One unveiled an original concept for autonomous transportation in the UAE, including designs for the world’s first Hyperloop One Portals (the equivalent of a station or airport) and Hyperloop One Pods that can take passengers from Dubai to Abu Dhabi in 12 minutes, compared to a two-hour drive.
Read More →Time lapse showing an Elizabeth line train being build at Bombardier in Derby, England. The full-length trains will be able to accommodate 1,500 passengers.
Read More →The order, worth over $21 million, represents the exercise of an option on a contract signed in 2011.
Read More →The installation of both the on-board and trackside equipment covers four test trains and an area of seven miles between the suburbs of Arncliffe and Oatley, in the South of Sydney.
Read More →With its previous "red light/green light" limited-data telematics solution, the London Sovereign team would only know if an erratic driving incident occurred, making it difficult to generate an accurate score of safe driving performance.
Read More →The award is part of a contract extension from a Nov. 13, 2014 LTC contract, awarded to New Flyer, whereby a one-year extension on the contract was exercisable at the discretion of LTC.
Read More →