METRO Magazine Logo
MenuMENU
SearchSEARCH

NTSB urges D.C. Metro to install backup safety technologies

The NTSB recently wrapped its investigation of the crash site in August.

by METRO Staff
August 11, 2009
3 min to read


In an urgent recommendation made in July, the National Transportation Safety Board (NTSB) urged the Washington Metropolitan Area Transit Authority (Metro) to install backup safety technology to its automated train control system following June's fatal crash involving two Metro trains.

"While the NTSB is still in the very early stages of its investigation into this tragic accident here in our nation's capital, we have concerns about the failure of [Metro's] train control system to prevent this collision," said Mark V. Rosenker, the NTSB's acting chairman.

Ad Loading...

With the investigation continuing, Metro officials have begun searching for vendors with expertise in backup safety technology for the automated train system, but a timetable for its deployment is undetermined because of the uniqueness of such a system.

"What the NTSB recommended is not something that you can buy at the hardware and install on your computer system. It would have to be something that would be tailor-made and built from scratch," said Metro Public Affairs Specialist, Steven Taubenkibel.

The accident, which occurred on June 22 when one Red Line train plowed into the rear of another stopped on the track, killed nine people and is the first Metro crash in 33 years. The NTSB has focused its investigation on a faulty circuit on the tracks that is part of the automated system for the trains. That circuit periodically lost its ability to detect trains after June 17, the day the part was replaced, the NTSB said July 1. Further testing showed that the circuit was still faulty even after it was again replaced. Although the problem can be replicated, investigators have not been able to isolate the specific cause.

The NTSB has agreed to allow Metro to initiate an independent panel of experts in signal systems through the American Public Transportation Association before its investigation has been completed. This effort will include an independent review of critical components such as signals and circuitry. The final findings will not only be important to Metro, but also to transit agencies across the nation, especially for those that use the same or a similar type of system.

Service on the Red Line was immediately impacted, but had begun to run at almost full strength by early July. Metro also took further preventive measures, including running its trains manually until further notice and inspecting all 3,000 of its track circuits throughout the rail system.

Ad Loading...

"We are running daily computerized tests on all of our circuits and everything else seems OK but, be that as it may, we're not going back to automatic as of yet," said Taubenkibel.

Metro is also looking to replace its Series 1000 railcars, which were involved in the accident, as soon as possible once specific funding is identified and available, according to Taubenkibel. In the meantime, the Series 1000 railcars were placed in the center of its trainsets.

As part of its recommendation, the NTSB also urged the FTA to advise all transit operators with automated train monitoring systems to evaluate safety redundancy. Taubenkibel explained that it will probably take some time until the NTSB's investigation yields results.

"We are cooperating with the NTSB. They have not completed their investigation, they're still at the scene and still doing their tests of circuits in the area as well as gathering additional data as part of their investigation," he said. "As long as they are out there, of course, we will cooperate with them, and we know it will take several months to possibly a year before they determine a final cause."

Subscribe to Our Newsletter

More Rail

A rendering of Trinity Metro's future station at the Medical Center
Rail•by Alex Roman•October 30, 2026

Trinity Metro Breaks Ground on $270M TEXRail Extension

The 2.1-mile extension will connect Fort Worth’s Medical District and Near Southside to downtown, surrounding communities, and Dallas-Fort Worth International Airport.

Read More →
Austin Light Rail rendering from UT perspective
Rail•by Alex Roman•October 30, 2026

Bringing Austin’s First Light Rail System to Life

Austin Transit Partnership CEO Greg Canally discusses the city's nearly 10-mile light rail project, its collaborative approach to project delivery, the importance of community engagement, and the milestones ahead as construction approaches in 2027.

Read More →
Two Metra locomotives on rail tracks.
Rail•by Alex Roman•October 29, 2026

Metra Draft Plan Outlines Costs, Service Improvements for Regional Rail

The Systemwide Network Plan identifies infrastructure needs and potential investments to expand all-day, bidirectional rail service across the Chicago region.

Read More →
Ad Loading...
METRO Magazine graphic featuring railroad tracks and switches inside a dark tunnel with the headline “Amtrak Completes First Street Tunnel Upgrades, Restores Service.”
Rail•by Elora Haynes•October 29, 2026

Amtrak Completes First Street Tunnel Upgrades, Restores Service

The nine-day construction project included replacing aging track infrastructure and modernizing switch systems near Washington Union Station.

Read More →
FRA Invests $2.3B in Rail Projects Nationwide
Rail•by Alex Roman•October 28, 2026

FRA Announces $2.3B for Passenger, Freight Rail Projects Nationwide

The CRISI Grant Program funding will support rail infrastructure improvements, safety upgrades, and projects aimed at improving freight and passenger rail service across 45 states and Washington, D.C.

Read More →
A Caltrain electric railcar on the tracks
Rail•by Alex Roman•October 27, 2026

Caltrain’s Electrification Drives a New Era of Ridership Growth

The railroad’s shift to electric service has brought more frequent trains, stronger customer satisfaction, and increased ridership, earning it APTA’s Outstanding Public Transportation System award.

Read More →
Ad Loading...
METRO Magazine graphic featuring a dark blue background with abstract curved lines and the headline “FTA Advances $164M Broward County Commuter Rail Project.”
Rail•by Staff and News Reports•October 26, 2026

FTA Advances $164M Broward County Commuter Rail Project

The proposed 10.5-mile commuter rail extension would connect Fort Lauderdale and Aventura, expanding passenger rail options in South Florida.

Read More →
An A line MTA subway car near the soon to be replaced signaling system.
Rail•by Staff and News Reports•October 23, 2026

New York MTA Launches Historic $1.9B Signal, Track Modernization Project

Funded in part by congestion pricing revenue, the project will replace nearly century-old signals along the A and C lines in Brooklyn and Queens.

Read More →
The LA Metro San Fernando Valley light rail extension corridor
Rail•by Alex Roman•October 20, 2026

LA Metro Breaks Ground on East San Fernando Valley Light Rail Project

The 6.7-mile line will add 11 stations along Van Nuys Boulevard, expand access to jobs and regional transit connections, and support Metro’s broader efforts to improve mobility as rail ridership grows.

Read More →
Ad Loading...
New Standard Helps Transit Agencies Address Climate Risks
Security and Safety•by Alex Roman•October 19, 2026

CSA Group Releases Climate Resilience Standard for Transit, Passenger Rail

Developed with support from the Standards Council of Canada, CSA D700 guides assessing climate-related risks and planning adaptation measures for transit and passenger rail systems.

Read More →