METRO Magazine Logo
MenuMENU
SearchSEARCH

Bombardier to provide up to 175 trams for Brussels

The first firm order under this framework contract is for 60 Flexity trams and is valued at approximately $206 million.

April 25, 2018
Bombardier to provide up to 175 trams for Brussels

 

2 min to read


Bombardier Transportation and the Brussels Intercommunal Transportation Co. (STIB) signed a framework agreement to supply up to 175 Bombardier Flexity trams. The total amount of the framework contract is valued up to approximately $586 million.

The first firm order under this framework contract is for 60 Flexity trams and is valued at approximately $206 million. The contract signature follows an announcement made by STIB in February selecting Bombardier Transportation as preferred bidder.

Ad Loading...

The new trams will feature a range of amenities, such as a passenger communication network with large high contrast LCD displays and a climatization system managed by intelligent sensors. Full LED lighting will reduce energy consumption while the track-friendly Bombardier Flexx Urban 3000 bogies will deliver a smooth ride with reduced vibration and noise. The driver's cab also features the company’s Driver's Assistance System, the latest safety technology that uses an intelligent array of cameras and sensors to detect pedestrians and other vehicles moving near the tram.

Some of the new trams will replace older high floor trams, while the rest will be used to increase STIB's tram fleet and capacity as they extend the network. Vehicles are scheduled for delivery starting in March 2020.

To date, Bombardier has delivered over 400 trams to STIB, this includes the older PCC series 7000 high floor trams delivered in the 70s, the T2000s delivered in the 90s, and the most recent order for 220 T3000 and T4000 trams delivered between 2005 and 2015.

More Rail

An Amtrak Acela train at New York Penn Station
Railby StaffMarch 24, 2026

Transportation Secretary Duffy, Amtrak Announce Progress on New York Penn Station Project

As part of the contract, the AECOM-LiRo NYPennT Joint Venture will work with Amtrak and the selected Master Developer to completely transform Penn Station, improving safety and operational efficiency, making the system more family-friendly, accommodating increased train and passenger capacity, and delivering a world-class experience to its growing passenger base, according to Amtrak officials.

Read More →
A screenshot of ZeroEyes AI gun detection technology.
Railby Staff and News ReportsMarch 24, 2026

ZeroEyes Launches ZeroLink to Expand AI Gun Detection Beyond Traditional Networks

New edge-based solution enables real-time threat detection and situational awareness in remote, mobile, and infrastructure-limited environments.

Read More →
A Chicago rail and rail car in the city.
Railby Staff and News ReportsMarch 23, 2026

Chicago Transit Authority Sues USDOT Over Paused Funding for Red Line Extension, Modernization Projects

The Chicago agency seeks restoration of nearly $2 billion in federal funding, warning halted projects could impact transit access and economic growth.

Read More →
Ad Loading...
GO Transit railcars
Railby StaffMarch 20, 2026

Alstom Awarded 5-Year Extension for GO Transit, UP Express Services

Company officials said that this latest contract extension with Metrolinx consolidates the company’s position as the leading private provider of Operations and maintenance services in North America.

Read More →
A New York MTA subway car with an open gangway
Railby StaffMarch 20, 2026

New York MTA Seeks Bids for 2,390 Subway Cars in Record-Breaking Order

The new cars, model R262, will be funded by the MTA’s 2025-29 Capital Plan, which received a historic $68 billion in funding from Governor Hochul and the State Legislature in the FY26 Enacted State Budget.

Read More →
Graphic from Amtrak promoting the B&P Tunnel Replacement and Frederick Douglass Tunnel project, featuring the Amtrak logo, project title and an illustration of a high-speed train near the West Baltimore MARC Station.
Railby News/Media ReleaseMarch 17, 2026

Amtrak Announces Community Grants for Projects Near Baltimore’s New Frederick Douglass Tunnel

Amtrak will open grant applications March 23 for community projects near the Frederick Douglass Tunnel alignment in Baltimore as part of a $50 million investment tied to the B&P Tunnel Replacement Program.

Read More →
Ad Loading...
Amtrak train with logo
Railby StaffMarch 16, 2026

Amtrak Marks Restoration of Two South Carolina Stations

The Denmark Station $2.3 million construction investment project includes a new 280-foot concrete boarding platform, built eight inches above the top of rail, for improved accessibility for passengers with disabilities and families with small children and much more.

Read More →
A view looking down the rail across the new Portal North Bridge.
Railby Staff and News ReportsMarch 13, 2026

NJ Transit, Amtrak Prepare to Open First Track on New Portal North Bridge

The new bridge will begin carrying passenger trains on March 16, replacing a 116-year-old swing bridge that has long caused delays.

Read More →
Caltrain trains on tracks
Railby StaffMarch 6, 2026

Caltrain Adopts Corridor-Wide Right-of-Way Safety Strategy

Caltrain and its partners have implemented safety improvements at specific locations in response to known risk conditions, operational needs, and available funding since the agency’s founding.

Read More →
Ad Loading...
A photo of rail tracks in Ottawa, Canada

Building a National Framework for Transit Safety and Consistency

On a recent episode of METROspectives, METRO Magazine’s Executive Editor Alex Roman sat down with Ana-Maria Tomlinson, Director of Strategic & Cross-Sector Programs at the CSA Group, to explore a bold initiative aimed at addressing those challenges: the development of a National Code for Transit and Passenger Rail Systems in Canada.

Read More →