METRO Magazine Logo
MenuMENU
SearchSEARCH

D.C. expands subway station cell phone service

Wireless contract is expected to generate approximately $25 million for Metro during the initial 15-year contract and an additional $27 million during the five, two-year renewal terms.

October 16, 2009
3 min to read


The Washington Metropolitan Area Transit Authority (Metro) expanded its cell phone service capability in 20 of busiest underground stations. Metrorail riders are able to use three major cell phone providers in addition to the existing Verizon Wireless service to make calls from 20 station platforms. Eventually, AT&T, Sprint and T-Mobile services will be available from anywhere inside the stations.

“It’s important for Metro customers to realize that, initially, expanded cell phone service is only from the platforms of 20 of our busiest underground stations,” said Metro GM John Catoe. “Customers should expect to see continual improvement in their cell phone coverage and call quality as additional enhancements to the wireless network are made.”

AT&T, Sprint, T-Mobile and Verizon Wireless have installed hardware at no cost to Metro that will allow Metrorail customers to make calls, send text messages or surf the Web from inside the following 20 stations: Ballston, Bethesda, Columbia Heights, Crystal City, Dupont Circle, Farragut North, Farragut West, Federal Triangle, Foggy Bottom-GWU, Friendship Heights, Gallery Pl-Chinatown, Judiciary Square, L’Enfant Plaza, McPherson Square, Metro Center, Pentagon, Pentagon City, Rosslyn, Smithsonian and Union Station.

During the next few weeks, the team of cell phone providers will continue to enhance the wireless network at these stations to provide callers with continuous coverage from the street into each station. Customers also will have broadband data network access.

Wireless service for the remaining 27 underground stations and for the entire Metrorail system is slated for completion by October 2012.

As part of the new wireless network installation, large cabinets that house cellular electronics have been installed in stations in areas that do not impede the flow of customers or impact the safe operation of the Metrorail system. New cables and antennae also were installed late at night when the Metrorail system was closed.

Previously, Metro riders could only receive cell phone service from multiple providers at above-ground stations. Until now, the underground wireless network only supported Verizon customers and Sprint phones that roamed onto the Verizon network. In 1993, Metro agreed to allow Bell Atlantic Mobile Systems, which later became Verizon Wireless, to build and maintain the first wireless network. In exchange, Verizon built a public safety radio communications system for Metro and paid annual fees to Metro. Verizon has offered wireless service in the Metrorail system since 1994.

AT&T, Sprint, T-Mobile and Verizon Wireless are responsible for owning, operating and maintaining the new wireless network. The firms also will build a second wireless network, which Metro will own, operate and maintain for Metro’s own public safety and operational communications. The second network will support future plans to launch The Metro Channel, which will provide riders with rail and bus service information, news and advertising via video monitors in stations, trains and buses.

The wireless contract is expected to generate approximately $25 million for Metro during the initial 15-year contract and an additional $27 million during the five, two-year renewal terms. Other FCC licensed and unlicensed carriers may gain access to the networks either through entering into agreements with Metro or the group of carriers, which would produce additional revenue for the transit agency.

More Rail

A New York MTA subway car with an open gangway
Railby Staff and News ReportsSeptember 16, 2026

New York MTA Advances Final Contract for Second Avenue Subway Expansion

Contract Four is the largest in the Second Avenue Subway Phase 2 project and includes construction of station infrastructure, tracks, and signals for the subway expansion, MTA officials said. Work on Contract Four will begin in 2027.

Read More →
A San Diego MTS Copper Line vehicle
Railby Staff and News ReportsSeptember 15, 2026

San Diego MTS Breaks Monthly Trolley Ridership Record

Agency officials said July’s ridership indicates MTS’s continued recovery from the pandemic.

Read More →
NJ TRANSIT's new Multilevel III commuter railcar manufactured by Alstom
Railby Alex RomanSeptember 14, 2026

Report Examines NJ TRANSIT Reliability, Funding Challenges

The Garden State Initiative analysis examines the roles of Amtrak infrastructure, fleet management, and agency operations while recommending a more performance-based approach to improving reliability.

Read More →
Ad Loading...
A CapMetro commuter rail train provided by Stadler
Railby Staff and News ReportsSeptember 11, 2026

Stadler, CapMetro Sign Long-Term Rail Fleet Support Agreement

Beginning in 2027, Stadler will provide on-site technical expertise, spare parts support, training, and obsolescence management to help extend the reliability and longevity of CapMetro’s GTW fleet.

Read More →
Rendering of an Alstom train in a VIA Rail Station
Technologyby Alex RomanSeptember 10, 2026

Biz Briefs: Alstom Lands Canadian Contract, LYT to Supply California TSP, and More

In METRO's latest installment, we take a look at recent news from Complete Coach Works, Beep, FlixBus, and more partnerships making headlines across the transportation sector.

Read More →
The CATS Gold Line in service with the city skyline in the background.
Railby Staff and News ReportsSeptember 3, 2026

CATS Gold Line Marks 5 Years of Service, 2.8M Passenger Trips

With a six-mile expansion planned, the Charlotte streetcar is positioned to connect more neighborhoods and major transit hubs across the region.

Read More →
Ad Loading...
Designing Stations Around the Passenger
RailSeptember 2, 2026

Why Simulating Pedestrian Movement Has Become Essential for Modern Rail Stations

Pedestrian microsimulation is helping rail planners identify bottlenecks, test station designs, and prepare complex transit hubs for growing passenger volumes.

Read More →
Amtrak Sunnyside Groundbreaking
Railby Staff and News ReportsSeptember 2, 2026

Amtrak Begins Major Construction at New York’s Sunnyside Yard

The new maintenance facility will support Amtrak’s Airo trainsets while improving maintenance efficiency and turnaround times in New York.

Read More →
O'Hare Flyer Rendering
Railby Staff and News ReportsAugust 27, 2026

Chicago Leaders Unveil Plans for O’Hare Airport Express Train

The privately developed project would offer a 15-minute trip between downtown and O’Hare’s Terminal 2, with trains operating every 15 minutes on a dedicated track. The service would use battery-electric trains and three existing freight rail rights-of-way.

Read More →
Ad Loading...
An OCTA coastal rail line train.
Railby Staff and News ReportsAugust 27, 2026

OCTA Maps Out 30-Year Strategy to Protect Coastal Rail Corridor

The draft feasibility report identifies strategies to protect the coastal rail line for decades as the agency continues near-term stabilization and sand placement efforts.

Read More →