METRO Magazine Logo
MenuMENU
SearchSEARCH

Keolis, MBTA to combat winter with 47-piece snow-fighting arsenal

The purchase of $8.6 million in snow-fighting equipment by the agency, includes 10 snow fighters, six speed swings, six wheel loaders and 25 tractors.

November 5, 2015
Keolis, MBTA to combat winter with 47-piece snow-fighting arsenal

 

3 min to read


Purchasing new snow fighting equipment, creating dedicated snow response teams and centralizing passenger communications are among the actions being taken by Keolis Commuter Services and the Massachusetts Bay Transportation Authority (MBTA) to prepare the commuter rail system for winter in order to keep trains operating safely and to minimize impacts to passengers.

“Our passengers expect and deserve a safe, dependable commuter rail service year-round,” said Keolis GM Gerald C. Francis. “We are taking every necessary step to prepare for winter, with the goal of keeping the commuter rail system operating safely and keeping our passengers informed about any changes in service.”

Ad Loading...
Photo of snow fighting equipment shown during Nov. 4 press event. Keolis

When snow and/or ice conditions are predicted, all Keolis departments will be placed on alert, with department heads coordinating all actions required for the storm.

Keolis senior management will determine the severity of an event using such factors as the existing snow base, the three-day forecast and the three-day temperature forecast. Weather events will be categorized as:

Level 1 – No impact or minor impact expected
Level 2 – Moderate impacts expected
Level 3 – Moderate to significant impacts expected
Level 4 – Significant impact – no revenue service

The Keolis Snow Manager and Snow Team will be activated, a radio command center will be established and, at Level 2 or greater, a Situation Room will be established as managers begin implementing relevant recovery activities, according to the resiliency plans.

Passengers will be notified as far in advance as possible about any changes to service or schedules.

During Level 4 storms, service will be halted until it can be safely restored, with non-revenue trains and snow removal equipment working round the clock to clear and remove snow.

Other key elements of the winter preparations include:

  • Creation of a centralized Passenger Information Center to ensure the information provided to the public is useful, accurate and timely via T-Alerts, social media (MBTA_CR), the official commuter rail mobile app, via the Customer Service call center, in stations, on board trains and through the news media.

  • Appointment of a manager dedicated to planning, coordinating and managing activities across all departments during major weather-related events.

  • Creation of cross-functional teams focused on snow removal at locations essential to accessing and operating the commuter rail system, including station entrances, platforms, maintenance facilities and essential switches on the main lines.

  • A dedicated weather desk to monitor weather conditions and provide up-to-date information to the organization.

Ad Loading...
  • The purchase of $8.6 million in snow-fighting equipment by the MBTA, including 10 snow fighters, six speed swings, six wheel loaders and 25 tractors.

  • Training to increase the number of staff able to operate the equipment used to remove snow. For each piece of equipment, at least three operators will be trained or licensed.

  • Replacing, refurbishing or making modifications to traction motors to ensure a full fleet of locomotives is available during the winter. Mesh material has been placed over all locomotive engine compartment vents to lessen the impact of snow or ice getting into engines. Refurbished traction motors have been triple dipped in a protective coating, adding three layers of protective coating where one existed before.

  • Placing into service by year end 40 new MPI locomotives, which are built with AC traction motors that are less susceptible to ingestion of light fluffy snow.

  • Conducting required safety inspections in advance to reduce the number of locomotives taken out of service during critical winter months.

Ad Loading...
  • Pre-treating passenger coach doors with de-icing solutions 12 to 24 hours before a winter event to minimize freezing.

  • Towns near layover facilities will be notified that locomotives may need to idle throughout the night during a winter event.

  • Following a major weather event, engineering teams will conduct system wide inspections of all routes, to quickly identify defects and needed repairs.

More Rail

A photo of an Amtrak train with a logo
Managementby Alex RomanJuly 24, 2026

Biz Briefs: STV teams with Amtrak, Motorcoach Operators Boost Fleet and Land Contracts, and More

From manufacturers and suppliers to transit agencies and motorcoach operators, these updates offer a snapshot of the projects, partnerships and business moves driving the industry forward.

Read More →
Metra Electric Line Vehicles
Railby Staff and News ReportsJuly 24, 2026

Metra Celebrates 100 Years of Electric Rail, Looks to the Future

The event was also a celebration of recent reforms to public transportation in the Chicago area, changes that could be as transformative in the future as the major civic achievement a century ago, said officials.

Read More →
LA Metro at State of the Agency event.
Managementby Alex RomanJuly 23, 2026

LA Metro Marks Banner Year, Sets Ambitious Goals for New Fiscal Year

Incoming LA Metro Board Chair and Los Angeles Mayor Karen Bass joined outgoing Board Chair Fernando Dutra and LA Metro CEO Stephanie Wiggins to review accomplishments from fiscal year 2026, which included the opening of new rail extensions, advancement of major transit projects, expanded safety programs, and new rider amenities.

Read More →
Ad Loading...
Nathaniel P. Ford Sr., named President/CEO at DART
Managementby Alex RomanJuly 22, 2026

DART Taps Nathaniel P. Ford Sr. as Next President/CEO

Since 2012, Ford has served as the CEO of the Jacksonville Transportation Authority

Read More →
California High Speed Rail in High Desert Corridor
Railby Alex RomanJuly 21, 2026

California High-Speed Rail Authority Signs MOU to Advance High Desert Corridor

The agreement deepens collaboration between the California High-Speed Rail Authority and the High Desert Corridor Joint Powers Agency, supporting design integration, cost savings, and faster delivery of a key Southern California rail link.

Read More →
TechnologyJuly 20, 2026

Building the Next Generation of Transit Technology

In this edition of METROspectives, Luminator CEO Magnus Friberg discusses the company's transformation, the growing role of AI and software, and what's next for transit technology.

Read More →
Ad Loading...
What Transit Agencies Get Wrong About Data METROspectives episode with strada360's Steve Lassey
Sponsoredby Alex RomanJuly 20, 2026

How Data, Strategy, and Community Engagement Are Reshaping Transit

In this edition of METROspectives, strada360 CEO Steve Lassey discusses how transit agencies can better align planning with operations, leverage data to improve decision-making, and build public trust as they prepare for the future of mobility.

Read More →
TTC streetcar on tracks

TTC Launches Camera Pilot to Curb Illegal Passing of Streetcars

During the pilot, the cameras will measure how often illegal streetcar passing occurs and test the technology's reliability for future automated enforcement.

Read More →
An NJ TRANSIT River Line light rail vehicle.
Managementby Staff and News ReportsJuly 17, 2026

NJ TRANSIT Secures Capital Funding, Adopts FY2027 Budget

The budgets continue investments in infrastructure and equipment to maintain the system in a state of good repair and enhance the overall customer experience.

Read More →
Ad Loading...
A rider validating a tap payment on a Masabi validator.
Technologyby Staff and News ReportsJuly 17, 2026

Biz Briefs: Masabi Teams with St. Louis Metro and More

In METRO's latest installment, we take a look at recent news from Transdev, Hitachi, and more partnerships making headlines across the transportation sector.

Read More →