Las Vegas RTC completes Flamingo corridor improvements
The corridor is a major east-west arterial street that connects extensive existing and planned commercial and residential development directly to the heart of the Resort Corridor and the University of Nevada, Las Vegas campus.
The Federal Transit Administration’s (FTA) Acting Administrator Carolyn Flowers joined Nevada state and local officials to celebrate the completion of the Flamingo Corridor Improvements Project, which will significantly enhance transit service and traffic flow along one of the busiest travel corridors in Las Vegas.
“The Obama Administration is committed to investing in transportation projects that improve mobility and help residents access jobs, education, and other opportunities,” said U.S. Transportation Secretary Anthony Foxx. “Improvements along Flamingo Road will provide safer, more efficient travel for thousands of commuters and students, and also support strong economic development in the corridor.”
Flamingo Road is a major east-west arterial street that connects extensive existing and planned commercial and residential development directly to the heart of the Resort Corridor and the University of Nevada, Las Vegas campus. Improvements along the 14-mile corridor include the installation of more than 100 new bus shelters, upgrades to intersections and traffic signals, upgraded pedestrian crosswalks, and the addition of dedicated bus and bicycle lanes.
“FTA is proud to partner with Nevada to bring more modern and convenient transit service to the busy Flamingo Road corridor,” said FTA Acting Administrator Flowers. “This project will make a huge difference for the thousands of bus riders who depend on public transit with technology and design improvements that will help reduce delays and improve reliability.”
The U.S. Department of Transportation (DOT) helped fund the project with $13.3 million from a Transportation Investment Generating Economic Recovery (TIGER) grant and $1 million in other DOT funds. The remaining cost of the $46.4 million project is being covered by local funding sources.
ABQ RIDE Forward is the first transit system overhaul in more than 25 years. This latest phase marks 15% completion of the 16-phase rollout, which will continue over the next several years.
During the meeting, the board approved a resolution invalidating a previously amended contract and authorized Board Chair Ann Duplessis to negotiate a separation agreement with CEO Lona Edwards Hankins.
The Pilot Program for TOD Planning helps support FTA’s mission of improving America’s communities through public transportation by providing funding to local communities to integrate land use and transportation planning with a new fixed-guideway or core-capacity transit capital investment.
Transit agencies have moved past pilot projects, but scaling electrification is exposing a harder truth: the real challenge isn’t vehicles, it’s everything around them.
The only new subway opening in the US this year, the D Line Extension represents one of Metro’s top transit priorities and a historic milestone for Los Angeles, with Sections 2 and 3 set to open in 2027.
In Part 2 of a two-part conversation, AC Transit’s director of maintenance joins co-hosts Alex Roman and Mark Hollenbeck to discuss his maintenance team’s work with various types of vehicle, training, augmented reality, and more.
The transit agency cites labor disruptions, demographic shifts, and evolving rider needs as it advances safety initiatives, paratransit changes, and major infrastructure projects across its network.
John Hatman, COO of Master’s Transportation, breaks down the priorities, warning signs and common mistakes fleet managers should address now to stay ahead of summer demand.
See how the TTC is testing a new wayfinding system at major subway stations while planning to introduce fare capping to make transit easier to navigate and more affordable for riders.