Miami-Dade adds more LCD information displays
Provide passengers with train arrival and departure times for the next three trains and show which trains serve the Green Line and which serve the Orange Line.


With the installation of liquid crystal display (LCD) screens at Metrorail station platforms, Miami-Dade Transit (MDT) can ensure passengers always have access to the most-up-to date transit news.
The LCD displays, which face both the north and southbound tracks, provide passengers with train arrival and departure times for the next three trains and show which trains serve the Green Line and which serve the Orange Line.
“Real-time train arrival information is very important to our customers,” said MDT Director Ysela Llort. “These LCD screens ensure that our passengers are always kept informed regarding our Metrorail service.”
The new screens are the most recent technological improvement made by MDT to its Metrorail system. The LCD screens are scheduled to be installed at all 23 Metrorail stations by late summer 2013. One of the best features is that they allow MDT to publish, update and remove information instantly and remotely. The information displayed on the LCD screen is the same as what passengers are able to view with the MDT Tracker App downloaded to their smart phones.
While one screen displays the train schedules, the one next to it is being used for advertising and public service announcements. The monitors will flash an announcement on screen whenever there is a disruption of service. Additional benefits include alerting passengers about elevator and escalator disruptions, as well as keeping passengers informed about upcoming special events and other changes to their commutes.

The monitors will flash an announcement on screen whenever there is a disruption of service.
The system provides wireless access at Metrorail station platforms for patrons wishing to use their electronic devices while waiting for the train. Wi-Fi is also available within Metrorail cars and has been utilized since 2010.
More Rail

New York MTA Advances Final Contract for Second Avenue Subway Expansion
Contract Four is the largest in the Second Avenue Subway Phase 2 project and includes construction of station infrastructure, tracks, and signals for the subway expansion, MTA officials said. Work on Contract Four will begin in 2027.
Read More →
San Diego MTS Breaks Monthly Trolley Ridership Record
Agency officials said July’s ridership indicates MTS’s continued recovery from the pandemic.
Read More →
Report Examines NJ TRANSIT Reliability, Funding Challenges
The Garden State Initiative analysis examines the roles of Amtrak infrastructure, fleet management, and agency operations while recommending a more performance-based approach to improving reliability.
Read More →
Stadler, CapMetro Sign Long-Term Rail Fleet Support Agreement
Beginning in 2027, Stadler will provide on-site technical expertise, spare parts support, training, and obsolescence management to help extend the reliability and longevity of CapMetro’s GTW fleet.
Read More →
Biz Briefs: Alstom Lands Canadian Contract, LYT to Supply California TSP, and More
In METRO's latest installment, we take a look at recent news from Complete Coach Works, Beep, FlixBus, and more partnerships making headlines across the transportation sector.
Read More →
CATS Gold Line Marks 5 Years of Service, 2.8M Passenger Trips
With a six-mile expansion planned, the Charlotte streetcar is positioned to connect more neighborhoods and major transit hubs across the region.
Read More →
Why Simulating Pedestrian Movement Has Become Essential for Modern Rail Stations
Pedestrian microsimulation is helping rail planners identify bottlenecks, test station designs, and prepare complex transit hubs for growing passenger volumes.
Read More →
Amtrak Begins Major Construction at New York’s Sunnyside Yard
The new maintenance facility will support Amtrak’s Airo trainsets while improving maintenance efficiency and turnaround times in New York.
Read More →
Chicago Leaders Unveil Plans for O’Hare Airport Express Train
The privately developed project would offer a 15-minute trip between downtown and O’Hare’s Terminal 2, with trains operating every 15 minutes on a dedicated track. The service would use battery-electric trains and three existing freight rail rights-of-way.
Read More →
OCTA Maps Out 30-Year Strategy to Protect Coastal Rail Corridor
The draft feasibility report identifies strategies to protect the coastal rail line for decades as the agency continues near-term stabilization and sand placement efforts.
Read More →