NTSB issues rail work safety recs
In response to an Amtrak collision and derailment last year, advised the FRA and FTA to provide railroad employees with best practices regarding the use of jumper wires when performing signal maintenance operations on active rails.
The National Transportation Safety Board (NTSB) issued four recommendations addressing safety issues related to ongoing railroad accident investigations near Madison, Ill., and Niles, Mich., involving the use of jumper wires during railroad signal maintenance operations.
As a result, NTSB recommends the Federal Railroad Administration and Federal Transit Administration provide railroad employees with the best practices regarding the use of jumper wires when performing signal maintenance operations on active rails.
"Required safety precautions were not taken by railroad employees during maintenance and repair activities that resulted in one fatality and put hundreds of passengers at risk," said NTSB Chairman Deborah A.P. Hersman. "In railroading, what may seem like a small oversight can have deadly consequences — that is why we issue our recommendations — to shine a light on problems that need attention."
On Feb. 28, 2012, a southbound Amtrak train collided with an automobile at a highway-rail crossing near Madison, Ill. As a result of the accident, the automobile driver was fatally injured. At the time of the accident, two Union Pacific employees were working on the grade crossing warning system. Preliminary information resulting from the NTSB's investigation indicates that the highway-rail grade crossing warning system had been temporarily removed from service for testing, inspection and maintenance. The warning system did not activate as the train approached the crossing.
On Oct. 21, 2012, an eastbound Amtrak train was routed onto a yard track while traveling 61 mph on a main track in Niles, Mich. The train derailed about 254 feet beyond the power-operated switch and traveled about 1,086 feet before stopping on the yard track. The four cars and two locomotives derailed upright and in line with the track. On board the train were 165 passengers and four crew members.
During the ongoing investigation, NTSB investigators learned that an Amtrak signal employee was performing troubleshooting activities with jumper wires inside the signal bungalow just prior to the derailment. This action circumvented the signal system's ability to verify that the power-operated switch was properly aligned and locked in the correct position for the displayed signals.
To view the recommendations, click here and here.
More Rail

Scenes from APTA TRANSform & EXPO 2026
Transit leaders, manufacturers, and industry professionals gathered in Chicago to explore new technologies, share ideas, and discuss the future of public transportation.
Read More →
USDOT Awards $416 Million for Florida Rail Crossing Safety Upgrades, New Brightline Station
The projects aim to reduce risks for motorists and pedestrians at rail crossings while expanding passenger rail access along Florida’s Space Coast.
Read More →
OCTA Declares Emergency to Protect Rail Corridor From Coastal Erosion
The California agency is accelerating shoreline protection and plans to place approximately 690,000 cubic yards of sand along the San Clemente coast to protect a key passenger and freight rail link.
Read More →
More Than a Summer Job: Building the Next Generation of Transit Talent
The Delaware River Port Authority and PATCO have transformed their internship program into a hands-on professional development experience that introduces students to the breadth of transportation careers — and creates a pipeline for future employees.
Read More →
Airo Trains Make Their Amtrak Cascades Debut in the Pacific Northwest
Effective immediately, two cutting-edge Airo trainsets will join the Amtrak Cascades route, operating four daily trips between Vancouver, B.C., Seattle, Portland, and Eugene, Oregon, marking the first introduction of Airo trains into passenger service anywhere in the country.
Read More →
Florida's Brightline Announces Financial Restructuring
Brightline Florida says train operations will continue as normal as certain parent entities enter Chapter 11 and financial stakeholders provide $490 million in new long-term capital.
Read More →
ENC Lands MATA Contract and More in Biz Briefs
In this edition of Biz Briefs, we spotlight the latest developments shaping the future of mobility.
Read More →
Strada360’s Steve Lassey on Turning Transit Data Into Better Decisions
From breaking down data silos to preparing for AI, Strada360 CEO Steve Lassey discusses how transit agencies can use technology to improve operations, customer information, and long-term decision-making.
Read More →
SEPTA Details Accelerate Vision for Transit System
The plan outlines investments in trolley modernization, new Metro and Regional Rail vehicles, accessible stations, and more frequent bus and rail service.
Read More →
FTA Ends Direct Oversight of MBTA Safety Actions
The federal agency closed its remaining special directive to the Massachusetts Department of Public Utilities following a safety review that began in 2022.
Read More →