METRO Magazine Logo
MenuMENU
SearchSEARCH

NTSB issues rail work safety recs

In response to an Amtrak collision and derailment last year, advised the FRA and FTA to provide railroad employees with best practices regarding the use of jumper wires when performing signal maintenance operations on active rails.

March 11, 2013
2 min to read


The National Transportation Safety Board (NTSB) issued four recommendations addressing safety issues related to ongoing railroad accident investigations near Madison, Ill., and Niles, Mich., involving the use of jumper wires during railroad signal maintenance operations.

As a result, NTSB recommends the Federal Railroad Administration and Federal Transit Administration provide railroad employees with the best practices regarding the use of jumper wires when performing signal maintenance operations on active rails.

"Required safety precautions were not taken by railroad employees during maintenance and repair activities that resulted in one fatality and put hundreds of passengers at risk," said NTSB Chairman Deborah A.P. Hersman. "In railroading, what may seem like a small oversight can have deadly consequences — that is why we issue our recommendations — to shine a light on problems that need attention."

On Feb. 28, 2012, a southbound Amtrak train collided with an automobile at a highway-rail crossing near Madison, Ill. As a result of the accident, the automobile driver was fatally injured. At the time of the accident, two Union Pacific employees were working on the grade crossing warning system. Preliminary information resulting from the NTSB's investigation indicates that the highway-rail grade crossing warning system had been temporarily removed from service for testing, inspection and maintenance. The warning system did not activate as the train approached the crossing.

On Oct. 21, 2012, an eastbound Amtrak train was routed onto a yard track while traveling 61 mph on a main track in Niles, Mich. The train derailed about 254 feet beyond the power-operated switch and traveled about 1,086 feet before stopping on the yard track. The four cars and two locomotives derailed upright and in line with the track. On board the train were 165 passengers and four crew members.

During the ongoing investigation, NTSB investigators learned that an Amtrak signal employee was performing troubleshooting activities with jumper wires inside the signal bungalow just prior to the derailment. This action circumvented the signal system's ability to verify that the power-operated switch was properly aligned and locked in the correct position for the displayed signals.

To view the recommendations, click here and here.

More Rail

A view looking down the rail across the new Portal North Bridge.
Railby Staff and News ReportsMarch 13, 2026

NJ Transit, Amtrak Prepare to Open First Track on New Portal North Bridge

The new bridge will begin carrying passenger trains on March 16, replacing a 116-year-old swing bridge that has long caused delays.

Read More →
Caltrain trains on tracks
Railby StaffMarch 6, 2026

Caltrain Adopts Corridor-Wide Right-of-Way Safety Strategy

Caltrain and its partners have implemented safety improvements at specific locations in response to known risk conditions, operational needs, and available funding since the agency’s founding.

Read More →
A photo of rail tracks in Ottawa, Canada

Building a National Framework for Transit Safety and Consistency

On a recent episode of METROspectives, METRO Magazine’s Executive Editor Alex Roman sat down with Ana-Maria Tomlinson, Director of Strategic & Cross-Sector Programs at the CSA Group, to explore a bold initiative aimed at addressing those challenges: the development of a National Code for Transit and Passenger Rail Systems in Canada.

Read More →
Ad Loading...
Stairs in a New York rail station with text reading "USDOT Invests $686 Million to Modernize Aging Rail Stations."
Railby StaffMarch 2, 2026

FTA Invests $686M to Modernize Aging Rail Stations

Competitive FTA grants will support accessibility upgrades, family-friendly improvements, and cost-efficient capital projects at some of the nation’s oldest and busiest transit hubs.

Read More →
A purple MBTA train at a Mansfield Station platform.
Railby StaffFebruary 27, 2026

MBTA Updates Rail Modernization Plan to Expand Reliability and Accessibility

The strategy outlines near- and long-term upgrades to ease congestion, support housing growth, and advance statewide climate goals.

Read More →
LA Metro underground station with vehicle
Railby StaffFebruary 27, 2026

LA Metro Sets D Line Subway Extension Launch Date

The 3.92-mile addition will soon take riders west beyond its current Wilshire and Western station in Koreatown, continuing under Wilshire Boulevard through neighborhoods and communities including Hancock Park, Windsor Square, the Fairfax District, and Carthay Circle into Beverly Hills.

Read More →
Ad Loading...
MBTA railcars
Railby StaffFebruary 26, 2026

Boston's MBTA Marks Progress in Regional Rail Modernization

The procurement advances the agency's broader efforts to modernize its rail fleet and position Regional Rail for long-term improvement.

Read More →
An Amtrak Acela
Railby StaffFebruary 26, 2026

Amtrak Sets New Course for Long-Distance Fleet Renewal

Under the plan, all long-distance routes will transition to a universal single-level fleet, replacing today’s mix of bi-level and single-level equipment.

Read More →
A TriMet MAX Light Rail vehicle overhead shot
Railby StaffFebruary 24, 2026

STV Finalizes Design for First Phase of TriMet MAX Blue Line Substation Upgrades

The milestone is a significant step toward modernizing the MAX Blue Line’s power infrastructure, one of the oldest components of the region’s light rail system.

Read More →
Ad Loading...
HDR rendering of LA to Coachella Valley Rail Project
Railby StaffFebruary 20, 2026

HDR Selected to Advance LA–Coachella Valley Rail Corridor Project

The firm will lead the Tier 2 environmental review program for the Coachella Valley Rail Corridor, including the conceptual and preliminary engineering needed to develop project-level environmental clearance.

Read More →