NTSB issues rail work safety recs
In response to an Amtrak collision and derailment last year, advised the FRA and FTA to provide railroad employees with best practices regarding the use of jumper wires when performing signal maintenance operations on active rails.
The National Transportation Safety Board (NTSB) issued four recommendations addressing safety issues related to ongoing railroad accident investigations near Madison, Ill., and Niles, Mich., involving the use of jumper wires during railroad signal maintenance operations.
As a result, NTSB recommends the Federal Railroad Administration and Federal Transit Administration provide railroad employees with the best practices regarding the use of jumper wires when performing signal maintenance operations on active rails.
"Required safety precautions were not taken by railroad employees during maintenance and repair activities that resulted in one fatality and put hundreds of passengers at risk," said NTSB Chairman Deborah A.P. Hersman. "In railroading, what may seem like a small oversight can have deadly consequences — that is why we issue our recommendations — to shine a light on problems that need attention."
On Feb. 28, 2012, a southbound Amtrak train collided with an automobile at a highway-rail crossing near Madison, Ill. As a result of the accident, the automobile driver was fatally injured. At the time of the accident, two Union Pacific employees were working on the grade crossing warning system. Preliminary information resulting from the NTSB's investigation indicates that the highway-rail grade crossing warning system had been temporarily removed from service for testing, inspection and maintenance. The warning system did not activate as the train approached the crossing.
On Oct. 21, 2012, an eastbound Amtrak train was routed onto a yard track while traveling 61 mph on a main track in Niles, Mich. The train derailed about 254 feet beyond the power-operated switch and traveled about 1,086 feet before stopping on the yard track. The four cars and two locomotives derailed upright and in line with the track. On board the train were 165 passengers and four crew members.
During the ongoing investigation, NTSB investigators learned that an Amtrak signal employee was performing troubleshooting activities with jumper wires inside the signal bungalow just prior to the derailment. This action circumvented the signal system's ability to verify that the power-operated switch was properly aligned and locked in the correct position for the displayed signals.
To view the recommendations, click here and here.
More Rail

New York MTA Leverages Zoning Program to Advance Station Accessibility
Accessibility enhancements at Nevins St Station will be financed through a development agreement tied to the MTA's Zoning for Accessibility initiative.
Read More →
Virginia's $28.5B Transportation Plan Targets Transit and Rail
Approved by the Commonwealth Transportation Board, the program supports ongoing infrastructure projects while providing new investments in transit, state of good repair and transportation alternatives.
Read More →
DOT: Brightline Corridor Incidents Fall 30% Following Federal Safety Upgrades
Safety improvements funded through a $25 million federal investment are credited with reducing trespassing and train-vehicle collisions along the Brightline Florida corridor.
Read More →
D Line Expansion Fuels Growth Across LA Metro's Rail System
Weekend rail ridership was especially strong, soaring 18% as riders embraced expanded access to jobs, entertainment, dining, and cultural destinations, said the agency. Total system ridership for May, including bus and rail, was 26,966,657.
Read More →
Southern California's Metrolink Debuts Contactless Fare Payment Pilot
Customers traveling between Redlands and Los Angeles can now tap their preferred payment method, including a credit or debit card, mobile wallet, or wearable device, at station validators before boarding and again while exiting.
Read More →
California's BART Approves FY27 Budget While Maintaining Service Levels
The budget covers July 1, 2026, through June 30, 2027, a period when pandemic emergency funds run out, the District faces a structural deficit of $375 million, and a regional transit funding measure may appear on the November ballot.
Read More →
Penn Station Transformation Advances with Design Unveiling
The historic redesign will transform the busiest transit hub in the Western Hemisphere from the tracks to the street level, creating a more efficient, cleaner, and functional experience for more than 600,000 daily commuters and millions of visitors.
Read More →
Second Avenue Subway Phase 2 Advances into Major Construction Stage
New York Governor Kathy Hochul joined leadership from the MTA, elected officials, and Harlem community leaders to break ground on the major construction stage of the transformative Second Avenue Subway Phase 2 project.
Read More →
The Invisible Infrastructure of Passenger Flow
What a seat reservation system on Austria’s Railjet trains reveals about the future of rider experience, and why U.S. agencies should pay attention.
Read More →
Caltrain Board Approves FY27 Budget, Endorses Efficiency Measures
The move ensures Caltrain service will continue operating as usual in the near term, but long-term financial challenges remain for the rail agency absent a new revenue source.
Read More →