RELATED: Streetcar design, tech advances bring more flexibility
OKC launches MAPS 3 streetcar system
The project was funded through MAPS 3, which is an $805 million capital improvement program that is funded by a one-cent sales tax initiative that began in April 2010.

The streetcar serves 22 platforms with five streetcars, which ride on rails flush with the street.
Photos courtesy EMBARK

The streetcar serves 22 platforms with five streetcars, which ride on rails flush with the street.
Photos courtesy EMBARK
Oklahoma City officials officially cut the ribbon on the MAPS 3 OKC Streetcar, bringing public transit on rails back to the city’s streets for the first time in generations.
“Our streetcar will be an important economic development tool for our entire city, accommodating visitors and residents alike. It will encourage walkability downtown, answer the question of how residents and visitors will circulate downtown once they arrive, and will inspire private investment all along the route,” said Mayor David Holt. “Already, we’ve seen $1.6 billion invested since the route was finalized, and we have every reason to believe that more will follow once the streetcar is open.”
The OKC Streetcar has two route options: the 4.8-mile Downtown Loop and two-mile Bricktown Loop.
The streetcar serves 22 platforms with five streetcars, which ride on rails flush with the street. The streetcars share the road with regular street traffic, and follow the same traffic rules. Streetcars may travel slower than some traffic and make frequent stops. Each OKC Streetcar stop is ADA-accessible for easy, level boarding with signage, real-time arrival information, covered shelters, and a ticket vending machine.
The streetcars use overhead wires for electric power on part of the route, and batteries for the rest. Each streetcar can carry 104 passengers, and each stop will be served every 15-18 minutes.

The OKC Streetcar has two route options: the 4.8-mile Downtown Loop and two-mile Bricktown Loop.
Herzog-Stacy and Witbeck built the rail line. Consultants include ADG, Jacobs Engineering, AECOM, and SOJ. EMBARK contracted Herzog Transit Services to manage OKC Streetcar’s day-to-day operations.
The project was funded through MAPS 3, which is an $805 million capital improvement program that is funded by a one-cent sales tax initiative that began in April 2010 and ended in December 2017. MAPS 3 funds eight projects: Downtown Convention Center, Downtown Public Park, Modern Streetcar/Transit, Oklahoma River Improvements, Oklahoma State Fairgrounds Improvements, Senior Health and Wellness Centers, Trails and Sidewalks.
More Rail

New York MTA Advances Final Contract for Second Avenue Subway Expansion
Contract Four is the largest in the Second Avenue Subway Phase 2 project and includes construction of station infrastructure, tracks, and signals for the subway expansion, MTA officials said. Work on Contract Four will begin in 2027.
Read More →
San Diego MTS Breaks Monthly Trolley Ridership Record
Agency officials said July’s ridership indicates MTS’s continued recovery from the pandemic.
Read More →
Report Examines NJ TRANSIT Reliability, Funding Challenges
The Garden State Initiative analysis examines the roles of Amtrak infrastructure, fleet management, and agency operations while recommending a more performance-based approach to improving reliability.
Read More →
Stadler, CapMetro Sign Long-Term Rail Fleet Support Agreement
Beginning in 2027, Stadler will provide on-site technical expertise, spare parts support, training, and obsolescence management to help extend the reliability and longevity of CapMetro’s GTW fleet.
Read More →
Biz Briefs: Alstom Lands Canadian Contract, LYT to Supply California TSP, and More
In METRO's latest installment, we take a look at recent news from Complete Coach Works, Beep, FlixBus, and more partnerships making headlines across the transportation sector.
Read More →
CATS Gold Line Marks 5 Years of Service, 2.8M Passenger Trips
With a six-mile expansion planned, the Charlotte streetcar is positioned to connect more neighborhoods and major transit hubs across the region.
Read More →
Why Simulating Pedestrian Movement Has Become Essential for Modern Rail Stations
Pedestrian microsimulation is helping rail planners identify bottlenecks, test station designs, and prepare complex transit hubs for growing passenger volumes.
Read More →
Amtrak Begins Major Construction at New York’s Sunnyside Yard
The new maintenance facility will support Amtrak’s Airo trainsets while improving maintenance efficiency and turnaround times in New York.
Read More →
Chicago Leaders Unveil Plans for O’Hare Airport Express Train
The privately developed project would offer a 15-minute trip between downtown and O’Hare’s Terminal 2, with trains operating every 15 minutes on a dedicated track. The service would use battery-electric trains and three existing freight rail rights-of-way.
Read More →
OCTA Maps Out 30-Year Strategy to Protect Coastal Rail Corridor
The draft feasibility report identifies strategies to protect the coastal rail line for decades as the agency continues near-term stabilization and sand placement efforts.
Read More →