METRO Magazine Logo
MenuMENU
SearchSEARCH

OKC launches MAPS 3 streetcar system

The project was funded through MAPS 3, which is an $805 million capital improvement program that is funded by a one-cent sales tax initiative that began in April 2010.

December 19, 2018
OKC launches MAPS 3 streetcar system

The streetcar serves 22 platforms with five streetcars, which ride on rails flush with the street.

Photos courtesy EMBARK

2 min to read


The streetcar serves 22 platforms with five streetcars, which ride on rails flush with the street. Photos courtesy EMBARK

Oklahoma City officials officially cut the ribbon on the MAPS 3 OKC Streetcar, bringing public transit on rails back to the city’s streets for the first time in generations.

“Our streetcar will be an important economic development tool for our entire city, accommodating visitors and residents alike. It will encourage walkability downtown, answer the question of how residents and visitors will circulate downtown once they arrive, and will inspire private investment all along the route,” said Mayor David Holt. “Already, we’ve seen $1.6 billion invested since the route was finalized, and we have every reason to believe that more will follow once the streetcar is open.”

Ad Loading...

The OKC Streetcar has two route options: the 4.8-mile Downtown Loop and two-mile Bricktown Loop.

The streetcar serves 22 platforms with five streetcars, which ride on rails flush with the street. The streetcars share the road with regular street traffic, and follow the same traffic rules. Streetcars may travel slower than some traffic and make frequent stops. Each OKC Streetcar stop is ADA-accessible for easy, level boarding with signage, real-time arrival information, covered shelters, and a ticket vending machine.

The streetcars use overhead wires for electric power on part of the route, and batteries for the rest. Each streetcar can carry 104 passengers, and each stop will be served every 15-18 minutes.

The OKC Streetcar has two route options: the 4.8-mile Downtown Loop and two-mile Bricktown Loop.

Herzog-Stacy and Witbeck built the rail line. Consultants include ADG, Jacobs Engineering, AECOM, and SOJ. EMBARK contracted Herzog Transit Services to manage OKC Streetcar’s day-to-day operations.

The project was funded through MAPS 3, which is an $805 million capital improvement program that is funded by a one-cent sales tax initiative that began in April 2010 and ended in December 2017. MAPS 3 funds eight projects: Downtown Convention Center, Downtown Public Park, Modern Streetcar/Transit, Oklahoma River Improvements, Oklahoma State Fairgrounds Improvements, Senior Health and Wellness Centers, Trails and Sidewalks.

More Rail

SFRTA TOD groundbreaking event
Railby StaffFebruary 17, 2026

SFRTA Breaks Ground on Its First Transit-Oriented Development

The project represents a significant milestone in the agency’s ongoing efforts to enhance connectivity, activate publicly owned land, and create walkable communities centered around transit.

Read More →
UTA FrontRunner vehicles.
Railby StaffFebruary 12, 2026

STV Tapped to Join Progressive Design-Build Team for UTA Rail Expansion 

The nearly $1 billion FrontRunner 2X project is a transformative investment to modernize and expand the 89-mile commuter rail corridor between Ogden and Provo.

Read More →
A rendering of Alstom's LRV for the Toronto Transit Commission.
RailFebruary 9, 2026

Alstom to Supply New Subway Trains for Toronto

Manufactured and tested in Canada, the vehicles will operate in tandem with a cutting-edge signaling system also supplied by Alstom.

Read More →
Ad Loading...
A 7000-series WMATA railcar at Navy Yard.
Railby StaffFebruary 6, 2026

WMATA and Kawasaki Resolve 7000-Series Railcar Disputes

A multiparty investigation, led by the NTSB and that included WMATA and KRC, found that wheel migration in the 7000-series railcars contributed to the derailment.

Read More →
Photo for METROspectives episode with Ana-Maria Tomlinson
ManagementFebruary 4, 2026

Establishing Standards & Codes in Canada, with CSA’s Ana-Maria Tomlinson

In this episode of METROspectives, METRO’s Executive Editor Alex Roman sits down with Ana-Maria Tomlinson, Director of Strategic & Cross-Sector Programs at the Canadian Standards Association (CSA Group).

Read More →
David Carol, Baker Alloush, and Jesse Lazarus from METRO's People Movement February 4 edition.
Managementby Staff and News ReportsFebruary 4, 2026

New Rolling Stock Strategy Lead at New York MTA and More in People Movement

In this edition, we cover recent appointments and announcements at HDR, NCTD, STV, and more, showcasing the individuals helping to shape the future of transportation.

Read More →
Ad Loading...
Railby StaffFebruary 2, 2026

Chicago Region Transit Ridership Grows in 2025

The region’s fixed-route system finished out the year with a total of 373.5 million rides. Adding 12.3 million rides over 2024 represents an increase that is equal to the annual transit ridership of Kansas City.

Read More →
Managementby StaffJanuary 29, 2026

Valley Metro Sees Strong Ridership Growth in 2025

The agency ranked top five among mid-sized U.S. transit systems, defined as agencies with 15 million to 50 million annual trips.

Read More →
Busby StaffJanuary 29, 2026

Subway Customer Satisfaction Reaches Record High, New York MTA Says

The subway system saw increases across all key metrics, with 62% of subway riders reporting they feel satisfied with the system overall.

Read More →
Ad Loading...
Managementby StaffJanuary 27, 2026

Keolis Retains Virginia Railway Express Contract

The new contract for Keolis and VRE will commence in July 2026, with the potential to expand to 15 years.

Read More →