METRO Magazine Logo
MenuMENU
SearchSEARCH

Sound Transit link completes install, certification of PTC

Completed implementation on all Sounder commuter rail vehicles that run between Lakewood and Everett. 

January 30, 2019
Sound Transit link completes install, certification of PTC

Sound Transit has completed implementation and certification of Positive Train Control (PTC) on all Sounder commuter rail vehicles that run between Lakewood and Everett. Photo: Sound Transit

2 min to read


Sound Transit has completed implementation and certification of Positive Train Control (PTC) on all Sounder commuter rail vehicles that run between Lakewood and Everett. Photo: Sound Transit

Sound Transit has completed implementation and certification of Positive Train Control (PTC) on all Sounder commuter rail vehicles that run between Lakewood and Everett. Positive train control technology can control train movements under certain conditions, automatically applying brakes and avoiding collisions.

Under the Positive Train Control system, should an engineer exceed the permitted speed or fail to brake on approach to a work zone or a signal, PTC will automatically apply the brakes and stop the train.

Automated Positive Train Control system increases Sounder riders’ safety from Sound Transit on Vimeo.

Ad Loading...

There are three categories of PTC equipment: Wayside equipment which is installed on the track; onboard equipment which is installed on the train; and back office equipment which is installed in the train operations center. Once the system is operational wayside radio and global positioning systems (GPS) determine train location and ensures trains are operating within established parameters.

Sound Transit implemented PTC in close collaboration with Burlington Northern Santa Fe (BNSF), an industry leader in PTC and the operator of Sounder service under contract to Sound Transit. PTC equipment on trains and tracks must communicate seamlessly and routinely with the back office systems deployed by BNSF. Sound Transit PTC equipment is fully interoperable with BNSF systems. Sound Transit executed its contract for installing PTC equipment in 2013, well ahead of many passenger rail agencies, and completed the installation and commissioning last year well in advance of the federal government’s deadline.

Sounder trains from Everett to Seattle began testing PTC in June 2017. Sounder trains from Tacoma to Seattle began testing PTC in August 2017. Sounder also operates on tracks owned by the agency between Tacoma and Lakewood known as the Lakewood Subdivision. Sounder service is also certified to operate under PTC in this subdivision.





More Rail

A New York MTA subway car with an open gangway
Railby Staff and News ReportsSeptember 16, 2026

New York MTA Advances Final Contract for Second Avenue Subway Expansion

Contract Four is the largest in the Second Avenue Subway Phase 2 project and includes construction of station infrastructure, tracks, and signals for the subway expansion, MTA officials said. Work on Contract Four will begin in 2027.

Read More →
A San Diego MTS Copper Line vehicle
Railby Staff and News ReportsSeptember 15, 2026

San Diego MTS Breaks Monthly Trolley Ridership Record

Agency officials said July’s ridership indicates MTS’s continued recovery from the pandemic.

Read More →
NJ TRANSIT's new Multilevel III commuter railcar manufactured by Alstom
Railby Alex RomanSeptember 14, 2026

Report Examines NJ TRANSIT Reliability, Funding Challenges

The Garden State Initiative analysis examines the roles of Amtrak infrastructure, fleet management, and agency operations while recommending a more performance-based approach to improving reliability.

Read More →
Ad Loading...
A CapMetro commuter rail train provided by Stadler
Railby Staff and News ReportsSeptember 11, 2026

Stadler, CapMetro Sign Long-Term Rail Fleet Support Agreement

Beginning in 2027, Stadler will provide on-site technical expertise, spare parts support, training, and obsolescence management to help extend the reliability and longevity of CapMetro’s GTW fleet.

Read More →
Rendering of an Alstom train in a VIA Rail Station
Technologyby Alex RomanSeptember 10, 2026

Biz Briefs: Alstom Lands Canadian Contract, LYT to Supply California TSP, and More

In METRO's latest installment, we take a look at recent news from Complete Coach Works, Beep, FlixBus, and more partnerships making headlines across the transportation sector.

Read More →
The CATS Gold Line in service with the city skyline in the background.
Railby Staff and News ReportsSeptember 3, 2026

CATS Gold Line Marks 5 Years of Service, 2.8M Passenger Trips

With a six-mile expansion planned, the Charlotte streetcar is positioned to connect more neighborhoods and major transit hubs across the region.

Read More →
Ad Loading...
Designing Stations Around the Passenger
RailSeptember 2, 2026

Why Simulating Pedestrian Movement Has Become Essential for Modern Rail Stations

Pedestrian microsimulation is helping rail planners identify bottlenecks, test station designs, and prepare complex transit hubs for growing passenger volumes.

Read More →
Amtrak Sunnyside Groundbreaking
Railby Staff and News ReportsSeptember 2, 2026

Amtrak Begins Major Construction at New York’s Sunnyside Yard

The new maintenance facility will support Amtrak’s Airo trainsets while improving maintenance efficiency and turnaround times in New York.

Read More →
O'Hare Flyer Rendering
Railby Staff and News ReportsAugust 27, 2026

Chicago Leaders Unveil Plans for O’Hare Airport Express Train

The privately developed project would offer a 15-minute trip between downtown and O’Hare’s Terminal 2, with trains operating every 15 minutes on a dedicated track. The service would use battery-electric trains and three existing freight rail rights-of-way.

Read More →
Ad Loading...
An OCTA coastal rail line train.
Railby Staff and News ReportsAugust 27, 2026

OCTA Maps Out 30-Year Strategy to Protect Coastal Rail Corridor

The draft feasibility report identifies strategies to protect the coastal rail line for decades as the agency continues near-term stabilization and sand placement efforts.

Read More →