Loading data...
Plans for the Central Loop East-West Transit Corridor include designated bus-priority lanes on two miles of streets The Loop BRT corridor will serve Union Station, Ogilvie Transportation Center, CTA subways and Navy Pier with more than 1,700 buses per day, making it one of the busiest bus routes in the nation. Expected to start service in 2014.
Read More →Like smaller models, couples a Cummins engine with an Allison transmission and includes standard features including an engine fire suppression system, lane departure warning system, tire pressure monitor system, ABS brakes, brake pad wear monitoring and warning system, and three-point seat belts.
Read More →The campaign, including signs and posters that say “Respect is Mutual,” follows a 73% increase in assaults on operators this year compared to 2014.
Read More →Agency has had 35 reports of sexual assault through the end of May. There were 56 sexual assault reports for all of 2014 and 67 in 2015.
Read More →The number of serious crimes reported on MTA's system has decreased from 388 in 2013 to 285 in 2014, 255 in 2015, and 240 in 2016.
Read More →The Charlotte Area Transit System has generated the revenue along the corridor since it was built five years ago. An expansion project is set to begin in 2014.
Read More →Lutz Bertling replaces André Navarri, who will remain as strategic advisor to the president/CEO until June 1, 2014 at which time he will retire from the organization.
Read More →Construction will begin soon; completion is expected by late 2013 or early 2014.
Read More →Raymond Diaz will oversee security for the agency, including coordinating security efforts with the Department of Homeland Security, FBI, the National Guard, NYPD and State Police, as well as the MTA Police Department.
Read More →The company's capabilities include installation of grade crossing warning signals, wayside and interlocking signals, as well as positive train control-related equipment.
Read More →