
As part of the PRT's refurbishment, Bombardier Transport will provide a new propulsion unit. The unit controls the electrical motor that's underneath the vehicle, enabling riders to notice the system's ramped up electrical power.
Read More →This new tranche is worth more than $431 million. Financing for this tranche will be split 50/50 between STIF (Syndicat des transports d'Ile-de-France) and the RATP.
Read More →The Florida Department of Transportation ordered 14 BiLevel railcars. The contract is valued at approximately $41 million. Deliveries are planned between May and August 2013.
Read More →
The Chicago Transit Authority has placed orders for 300 additional Bombardier Transportation rapid transit cars in addition to the 406 it contracted for in 2006. The 5000-Series cars will be the first in the agency’s fleet to utilize alternating current propulsion, a technology that permits dynamic braking regeneration.
Read More →The contract is valued at approximately $577 million. Bombardier will equip 192 miles of track line (25 miles in tunnels), 113 stations, 191 trainsets, 49 engineering trains and six heritage trains by 2018, using its communication-based train control technology, CITYFLO 650.
Read More →
The GoldLinQ consortium, of which the supplier is a member, will design, build, finance, operate and maintain the first stage of the Gold Coast Rapid Transit light rail public transportation system for the Queensland Government. Bombardier’s share of the contract is valued at approximately $265 million.
Read More →Companies have worked together since 2000 when the order for the elevated dual-lane guideway APM system was placed. Known as Skylink, the 64-car APM system offers convenient passenger travel in either direction on the comfortable, climate controlled INNOVIA vehicles, connecting Terminals A, B, C, D and E.
Read More →
Vehicle suppliers are stepping up to offer services for every facet of ownership, from installation of rail to refurbishment and modernization. Also, many are focusing on practices already in place throughout the world, where risk of ownership is actually transferred back to the company, enabling the rail operator to operate the system on an established fixed cost.
Read More →Valued at about $12 million, the contract also includes draft gears and bench test equipment. Wabtec expects to start deliveries later this year.
Read More →People mover will serve as the backbone for the smooth transportation of passengers between terminal areas at KAIA. Completion of the system is scheduled for the start of 2014.
Read More →